Business performance management (BPM) system and method having a physical star architecture, data processing rings and BPM loops
First Claim
1. A computer implemented Business Performance Management (BPM) system comprising:
- a BPM loop architecture for managing events of an enterprise, where said architecture comprisesa plurality of BPM loops, each BPM loop comprisinga physical star and a data processing ring of nodes, each node being implemented on the computer to acquire event data, process the acquired event data, and output the processed event data, each event being represented by an event data token whose possession by a node triggers said acquiring, processing and outputting with respect to the event data carried by the token;
a loop order, which is a specific order according to which a said event data token representing an event is sent to each successive loop node in said loop order, and which loop order never changes unless another loop node joins or leaves the loop;
wherein at least one of said plurality of BPM loops is an implementation of a node in another BPM loop;
a dispatching module that is a Multi Node Access Unit, the Multi Node Access Unit being connected to a set of BPM loop nodes;
wherein each BPM node on a BPM loop is both a data trans-former and a repeater;
wherein the physical star comprises several Multi Node Access Units connected in one BPM node while BPM links connect the Multi Node Access Units to the BPM nodes.
0 Assignments
0 Petitions
Accused Products
Abstract
An architecture, system, and method are provided for a commitment loop solution for on demand business activity management. A Business Performance Management (BPM) loop includes nodes each relating to different tasks for processing performance management trigger data generated by a business entity in real time. The beginning or sensing element of the loop is triggered by a token (representing a business event from a business process). The ending or executing element provides a business action to be implemented by the business entity. The token is passed from node to node sequentially in a particular order around the loop. Processing of the data represented by the token is governed by policies, which can be changed dynamically and follow a life cycle.
50 Citations
4 Claims
-
1. A computer implemented Business Performance Management (BPM) system comprising:
-
a BPM loop architecture for managing events of an enterprise, where said architecture comprises a plurality of BPM loops, each BPM loop comprising a physical star and a data processing ring of nodes, each node being implemented on the computer to acquire event data, process the acquired event data, and output the processed event data, each event being represented by an event data token whose possession by a node triggers said acquiring, processing and outputting with respect to the event data carried by the token; a loop order, which is a specific order according to which a said event data token representing an event is sent to each successive loop node in said loop order, and which loop order never changes unless another loop node joins or leaves the loop; wherein at least one of said plurality of BPM loops is an implementation of a node in another BPM loop; a dispatching module that is a Multi Node Access Unit, the Multi Node Access Unit being connected to a set of BPM loop nodes;
wherein each BPM node on a BPM loop is both a data trans-former and a repeater;wherein the physical star comprises several Multi Node Access Units connected in one BPM node while BPM links connect the Multi Node Access Units to the BPM nodes. - View Dependent Claims (2, 3, 4)
-
Specification