×

Process control using analysis of an upstream process

  • US 8,615,314 B1
  • Filed: 09/02/2004
  • Issued: 12/24/2013
  • Est. Priority Date: 09/02/2004
  • Status: Active Grant
First Claim
Patent Images

1. A method, comprising:

  • performing a first process on a workpiece;

    performing a qualitative analysis relating to said first process performed on said workpiece, said qualitative analysis comprising analyzing at least one metrology measurement relating to said first process and analyzing a workpiece feature, to evaluate a characteristic of said workpiece; and

    selecting a process control parameter for performing a second process on said workpiece based upon said qualitative analysis;

    wherein performing said qualitative analysis relating to said first process performed on said workpiece further comprises categorizing a characteristic of said workpiece into one of a plurality of groups, associating a plurality of recipes respectively to each of said groups, and selecting one of said plurality of recipes based upon said categorizing of said characteristic of said workpiece;

    wherein selecting one of said plurality of recipes further comprises selecting a recipe that at least partially causes a reduction in copper residue during a copper polishing process.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×