1. A method comprising:

  • placing a first layer of insulating material horizontally on the ground;

    placing plastic concrete cementitious-based material for a slab on grade on the first layer of insulating material;

    wherein the cementitious-based material comprises;

    aggregate;

    cementitious material, wherein the cementitious material consists essentially of approximately 30% to approximately 80% by weight portland cement, approximately 0% to approximately 50% by weight slag cement, and 20% to approximately 50% by weight fly ash; and

    water sufficient to hydrate the cementitious-based material;

    forming the plastic cementitious-based material into a desired shape having a top and sides;

    placing a second layer of insulating material on the top of the plastic cementitious-based material;

    leaving the first and second layers of insulating material in place until the cementitious-based material is at least partially cured; and

    removing the second layer of insulating material.