Managing method of building material and wireless chip applied to the method
First Claim
Patent Images
1. A material management method comprising the steps of:
- attaching a sheet including a plurality of memories each storing data of a material to a surface of the material;
dividing the material into pieces, together with the sheet in accordance with data in the memories, so that the pieces of the material each carry at least one of the memories;
constructing a building by using the divided material in accordance with data in the memories; and
checking the data on the constructed building, which is stored in the memories.
1 Assignment
0 Petitions
Accused Products
Abstract
A lot of buildings have been built while it is concerned that a building material is used fraudulently. Therefore, the present invention provides a managing method of the material and a system thereof. The present invention provides a managing method including a step of attaching a sheet including a plurality of memories to each surface of a plurality of materials, a step of dividing the plurality of materials with the sheet in accordance with data in the memory, a step of constructing a building by using the divided material in accordance with the data in the memory, and a step of checking the data on the constructed building, which is stored in the plurality of memories.
-
Citations
42 Claims
-
1. A material management method comprising the steps of:
-
attaching a sheet including a plurality of memories each storing data of a material to a surface of the material; dividing the material into pieces, together with the sheet in accordance with data in the memories, so that the pieces of the material each carry at least one of the memories; constructing a building by using the divided material in accordance with data in the memories; and checking the data on the constructed building, which is stored in the memories. - View Dependent Claims (2, 3, 4, 5)
-
-
6. A material management method comprising the steps of:
-
attaching a sheet including a plurality of write-once memories each storing data of a material to a surface of the material; dividing the material into pieces, together with the sheet in accordance with the data in the write-once memories, so that the pieces of the material each carry at least one of the memories; writing data on the dividing step in the write-once memories; constructing a building by using the divided material; writing data on the construction in the write-once memories; and checking the data on the constructed building, which is stored in the write-once memories. - View Dependent Claims (7, 8, 9, 10, 11, 12, 13, 14)
-
-
15. A material management method comprising the steps of:
-
attaching a sheet including a plurality of memories each storing data of a material to a surface of the material; wherein data on the material are stored in the plurality of memories and a log preventing a writing is set in the plurality of memories; dividing the material into pieces, together with the sheet in accordance with data in the memories, so that the pieces of the material each carry at least one of the memories; constructing a building by using the divided material in accordance with the data in the memories; checking the data on the building, which is stored in the memories; canceling the log of the memories; and writing data in the memories. - View Dependent Claims (16, 17, 18, 19)
-
-
20. A material management method comprising the steps of:
-
attaching a sheet including a plurality of memories to a surface of a material, data of the material having been stored in each of the memories by using a first processor; reading, by using a second processor, the data in the memories, and dividing the material into pieces, together with the sheet in accordance with the data, so that the pieces of the material each carry at least one of the memories; reading, by using a third processor, the data in the memories, and constructing a building by using the divided material in accordance with the data; and checking, by using a fourth processor, the data on the building, which is stored in the memories and providing the data to a client. - View Dependent Claims (21, 22, 23, 24, 25)
-
-
26. A material management method comprising the steps of:
-
attaching a sheet including a plurality of write-once memories to a surface of a material, data of the material having been stored in each of the write-once memories by using a first processor; reading, by using a second processor, the data in the write-once memories, dividing the material into pieces, together with the sheet, so that the pieces of the material each carry at least one of the memories, and storing data on the dividing step by using the second processor; reading, by using a third processor, the data in the write-once memories, constructing a building by using the divided material, and storing data on the construction by using the third processor; and checking, by using a fourth processor, the data on the building, which is stored in the write-once memories and providing the data to a client by using the fourth processor. - View Dependent Claims (27, 28, 29, 30, 31)
-
-
32. A material management method comprising the steps of:
-
attaching a sheet including a plurality of memories to a surface of a material, data of the material having been stored in each of the memories by using a first processor; wherein data on the material are stored in the plurality of memories and a log preventing a writing is set in the plurality of memories; dividing the material together into pieces, with the sheet in accordance with data read in the memories by using a second processor, so that the pieces of the material each carry at least one of the memories; constructing a building by using the divided material in accordance with data read in the memories by using a third processor; and checking the data on the constructed building, which is stored in the memories, canceling the log of the memories, writing a data in the memories, and providing the data to a client by using a fourth processor. - View Dependent Claims (33, 34, 35, 36, 37)
-
-
38. A material management method comprising the steps of:
-
attaching a sheet including a plurality of memories each storing data of a material to a surface of the material; dividing the material and the sheet attached thereto into pieces of divided material in accordance with data stored in the memories, so that the pieces of the material each carry at least one of the memories; combining the pieces of divided material with at least another material in accordance with the data in the memories. - View Dependent Claims (39, 40, 41, 42)
-
Specification