×

Process for separating and recovering metals

  • US 8,815,184 B2
  • Filed: 06/09/2011
  • Issued: 08/26/2014
  • Est. Priority Date: 08/16/2010
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method for recovering metals from a spent catalyst, the method comprising:

  • leaching a Group VIB metal, a Group VIII metal, and a Group VB metal, from the spent catalyst with an ammonia containing leach solution at a temperature and a pressure sufficient to form a pressure leach slurry;

    separating and removing a solid residue from the pressure leach slurry to form a pressure leach solution comprising a Group VIB soluble metal complex and a Group VIII soluble metal complex;

    treating the pressure leach solution by chemical precipitation to precipitate at least a portion of the Group VIB metal and at least a portion of the Group VIII metal as precipitated metal complexes;

    recovering the precipitated metal complexes by at least a separation means selected from settling, filtration, decantation, centrifugation and combinations thereof, forming a first effluent stream containing less than 600 ppm of the Group VIB metal and less than 400 ppm of the group VIII metal and a solid residue containing at least 97% of incoming VIB metal and over 80% of incoming Group VIII metal;

    sulfiding the first effluent stream with a sulfiding agent to form a sulfided slurry comprising a Group VB metal sulfide and/or oxide, a Group VIB metal sulfide and a Group VIII metal sulfide;

    separating and removing the Group VB metal sulfide and/or oxide, the Group VIB metal sulfide and the Group VIII metal sulfide from the sulfided slurry, forming a second effluent stream comprising a Group VB and a Group VIB soluble metal compound;

    contacting the second effluent stream with an effective amount of ferric ion at a pre-selected pH for the ferric ion to form a complex with the Group VB and Group VIB metal;

    performing a liquid-solid separation to remove the Group VB and Group VIB metal complex as solids, forming a third effluent containing less than 5 ppm of the Group VB metal and less than 5 ppm of the Group VIB metal.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×