Production logging processes and systems

  • US 8,850,899 B2
  • Filed: 04/07/2011
  • Issued: 10/07/2014
  • Est. Priority Date: 04/15/2010
  • Status: Active Grant
First Claim
Patent Images

1. A process comprising:

  • producing fluid from a subterranean environs into a well at spaced apart locations;

    releasing at least two markers into the fluid produced from said subterranean environs, each of the at least two markers being released at different locations of the spaced apart locations;

    measuring the elapsed time from the step of releasing until each of said at least two markers reaches a common point along the well, wherein the fluid is produced at a substantially constant production rate during the steps of releasing and measuring; and

    determining the flow rates of fluid produced from said subterranean environs at each of said spaced apart locations based upon said elapsed time.