×

Proactive adaptive equipment maintenance

  • US 8,886,470 B2
  • Filed: 01/31/2011
  • Issued: 11/11/2014
  • Est. Priority Date: 01/31/2011
  • Status: Active Grant
First Claim
Patent Images

1. A method comprising:

  • maintaining a stress layout representing a physical location, the stress layout including a grid system having a plurality of cells;

    calculating, by one or more processors, a maintenance indicator value for each cell in which a fixed object is located, the maintenance indicator value representing a stress level applied to the fixed object;

    determining whether the maintenance indicator value exceeds a maintenance threshold that indicates when maintenance should be performed on the fixed object; and

    automatically generating, without human intervention, a maintenance order that triggers maintenance for the fixed object in response to the maintenance indicator value exceeding the maintenance threshold.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×