×

Tubing conveyed multiple zone integrated intelligent well completion

  • US 8,893,783 B2
  • Filed: 06/07/2013
  • Issued: 11/25/2014
  • Est. Priority Date: 09/26/2012
  • Status: Active Grant
First Claim
Patent Images

1. A method of operating a tubing string in a subterranean well, the method comprising:

  • closing all of multiple flow control devices connected in the tubing string, the tubing string including multiple well screens which filter fluid flowing between the tubing string and respective ones of multiple earth formation zones, at least one optical waveguide which senses at least one property of the fluid as it flows between the tubing string and at least one of the zones, the multiple flow control devices which variably restrict flow of the fluid through respective ones of the multiple well screens, and multiple pressure sensors which sense a pressure differential across respective ones of the multiple flow control devices;

    at least partially opening a first selected one of the flow control devices; and

    measuring a first change in the property sensed by the optical waveguide and a first change in the pressure of the fluid as a result of the opening of the first selected one of the flow control devices.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×