Machine control system having autonomous resource queuing
First Claim
1. A control system for use with a plurality of mobile machines operating at a worksite having a resource, the control system comprising:
- a plurality of control modules, each associated with one of the plurality of mobile machines; and
a worksite controller in communication with the plurality of control modules, the worksite controller being configured to;
divide a common travel path of the plurality of mobile machines into a plurality of virtual segments, including at least a spot segment at the resource in which one of the plurality of mobile machines can be loaded, a stage segment in which one of the plurality of mobile machines can wait to be loaded, and a queue segment in which one of the plurality of mobile machines can wait to be directed to the stage segment;
receive a first input from an operator of the resource indicative of a desire for a first of the plurality of mobile machines to leave the spot segment;
instruct a first of the plurality of control modules associated with the first of the plurality of mobile machines to direct the first of the plurality of mobile machines out of the spot segment based on the first input;
receive first location information for the first of the plurality of mobile machines from the first of the plurality of control modules; and
instruct a second of the plurality of control modules associated with a second of the plurality of mobile machines to direct the second of the plurality of mobile machines out of the stage segment into the spot segment based on the first location information.
1 Assignment
0 Petitions
Accused Products
Abstract
A control system is disclosed for use with a plurality of mobile machines operating at a worksite having a resource. The control system may have a worksite controller configured to divide a common travel path into a plurality of segments, including at least a spot segment at the resource and a stage segment. The worksite control may further be configured to receive a first input indicative of a desire for a first of the plurality of mobile machines to leave the spot segment, and to direct the first of the plurality of mobile machines out of the spot segment based on the first input. The worksite controller may be further configured to receive first location information for the first of the plurality of mobile machines, and to direct the second of the plurality of mobile machines from the stage segment into the spot segment based on the first location information.
-
Citations
34 Claims
-
1. A control system for use with a plurality of mobile machines operating at a worksite having a resource, the control system comprising:
-
a plurality of control modules, each associated with one of the plurality of mobile machines; and a worksite controller in communication with the plurality of control modules, the worksite controller being configured to; divide a common travel path of the plurality of mobile machines into a plurality of virtual segments, including at least a spot segment at the resource in which one of the plurality of mobile machines can be loaded, a stage segment in which one of the plurality of mobile machines can wait to be loaded, and a queue segment in which one of the plurality of mobile machines can wait to be directed to the stage segment; receive a first input from an operator of the resource indicative of a desire for a first of the plurality of mobile machines to leave the spot segment; instruct a first of the plurality of control modules associated with the first of the plurality of mobile machines to direct the first of the plurality of mobile machines out of the spot segment based on the first input; receive first location information for the first of the plurality of mobile machines from the first of the plurality of control modules; and instruct a second of the plurality of control modules associated with a second of the plurality of mobile machines to direct the second of the plurality of mobile machines out of the stage segment into the spot segment based on the first location information. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16)
-
-
17. A non-transitory computer readable medium having computer executable instructions for performing a method of resource queuing, the method comprising:
-
dividing a common travel path for a plurality of mobile machines into a plurality of segments, including at least a spot segment at a resource in which one of the plurality of mobile machines can be loaded, a stage segment in which one of the plurality of mobile machines can wait to be loaded, and a queue segment in which one of the plurality of mobile machines can wait to be directed to the stage segment; receiving a first input from an operator of the resource indicative of a desire for a first of the plurality of mobile machines to leave the spot segment; directing the first of the plurality of mobile machines out of the spot segment based on the first input; receiving a first location information for the first of the plurality of mobile machines; and directing the second of the plurality of mobile machines from the stage segment into the spot segment based on the first location information. - View Dependent Claims (18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32)
-
-
33. A non-transitory computer readable medium having computer executable instructions for performing a method of resource queuing, the method comprising:
-
dividing a common travel path for a plurality of mobile machines into a plurality of segments, including at least a spot segment at a resource in which one of the plurality of mobile machines can be loaded, a stage segment located adjacent the spot segment in which one of the plurality of mobile machines can wait to be loaded, and a queue segment spaced apart from the stage segment by at least one of a cushion segment and an interference segment in which one of the plurality of mobile machines can wait to be directed to the stage segment; receiving a first input from an operator of the resource indicative of a desire for a first of the plurality of mobile machines to leave the spot segment; directing the first of the plurality of mobile machines out of the spot segment based on the first input; receiving a first location information for the first of the plurality of mobile machines; directing the second of the plurality of mobile machines from the stage segment into the spot segment based on the first location information; receiving a second input from the operator of the resource indicative of a desire for a third of the plurality of mobile machines to enter the stage segment; and directing the third of the plurality of mobile machines from the queue segment into the stage segment based on the second input. - View Dependent Claims (34)
-
Specification