×

Method for using dynamic target region for well path/drill center optimization

  • US 8,931,580 B2
  • Filed: 10/19/2010
  • Issued: 01/13/2015
  • Est. Priority Date: 02/03/2010
  • Status: Active Grant
First Claim
Patent Images

1. A method for determining drill center location and drill path for a well into a hydrocarbon formation, comprising:

  • selecting a target region of finite extent within the formation;

    determining an initial target segment in the target region; and

    solving an optimization problem wherein a drill center location and a drill path are determined subject to a plurality of constraints, one of said constraints being that the drill path has to penetrate the target region, wherein the determining an initial target segment in the target region is performed before solving the optimization problem and constraining the solution of the optimization problem to require that the drill path include the initial target segment or, if adjusted later in the optimization, a then-current target segment.

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×