×

Installation adapted with temperature equalization system

  • US 8,939,197 B2
  • Filed: 12/20/2011
  • Issued: 01/27/2015
  • Est. Priority Date: 05/26/2006
  • Status: Active Grant
First Claim
Patent Images

1. A temperature equalization system, comprising:

  • an installation;

    a heat equalizer disposed in a natural heat carrier, and being made of a material of heat conduction to conduct heat with the natural heat carrier;

    a relay heat equalizer made of a material of heat conduction;

    a first fluid transmission duct disposed between the relay heat equalizer and the installation, and having a first fluid contained therein for heat transmission;

    a second fluid transmission duct disposed between the heat equalizer and the relay heat equalizer, and having a second fluid contained therein for heat transmission;

    a pump (106) connected in series with the first fluid transmission duct for pumping the first fluid;

    a relay pump (206) connected in series with the second fluid transmission duct for pumping the second fluid;

    first and second fluid bypass ducts disposed in parallel in the installation and both in communication with the first fluid transmission duct, the first and second fluid bypass ducts respectively having first and second bypass control valves connected in series therewith, only the second fluid bypass duct having a bypass auxiliary pump connected in series therewith for pumping the first fluid flowing therethough; and

    a control means controlling an operation of temperature equalization system, the control meanscontrolling the pump (106) to pump the first fluid, to thereby circulate the first fluid through the relay heat equalizer, the first fluid transmission duct and an interior of the installation,controlling the relay pump (206) to pump the second fluid, to thereby circulate the second fluid through the relay heat equalizer, the second fluid transmission duct and the heat equalizer; and

    controlling the first and second bypass control valves to thereby control flow rates of the first fluid respectively flowing through the first and second fluid bypass ducts, and controlling pumping of the bypass auxiliary pump.

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×