×

Train end and train integrity circuit for train control system

  • US 8,942,868 B2
  • Filed: 12/31/2012
  • Issued: 01/27/2015
  • Est. Priority Date: 12/31/2012
  • Status: Active Grant
First Claim
Patent Images

1. A train system comprising:

  • a plurality of train units including a first train unit and a second train unit coupled to the first train unit, each of the plurality of train units comprising;

    a controller configured to detect a change in train configuration of the plurality of train units;

    train integrity signal lines spanning each train unit of the plurality of train units and coupled with the controller, the train integrity signal lines are configured to transmit signals between a front end and a rear end of the train system, the signals indicating a status of train integrity of the train system; and

    a plurality of relays in communication with the controller, and configured to indicate a coupling or non-coupling status of each train unit.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×