Regenerating electric power distribution switching plans based on changing power distribution network conditions

  • US 8,965,591 B2
  • Filed: 02/16/2012
  • Issued: 02/24/2015
  • Est. Priority Date: 02/16/2012
  • Status: Active Grant
First Claim
Patent Images

1. A method of regenerating switching plans based on a change in a power distribution network associated with the switching plans, the method comprising:

  • updating a power distribution network model in response to a power distribution network event, the power distribution network event representing a change in at least one area of the power distribution network;

    identifying the at least one area of the power distribution network affected by the power distribution network event;

    identifying switching plans that are impacted by the power distribution network event, each of the switching plans corresponding with a fault isolation and recovery solution for the at least one area of the power distribution network; and

    regenerating the switching plans that are impacted by the power distribution network event.

View all claims