1. A system comprising:
- a risk calculation system programmed to calculate a risk based on a static input and a dynamic input; and
a decision support system programmed to use the risk to derive a decision; and
a plant control system programmed to update operations of a plant based on the decision, to observe a plant system, and to store plant system observations as historical data, wherein the decision predicts future plant conditions, wherein the static input comprises a business environment data, wherein the dynamic input comprises a signal representative of an unexpected maintenance event, and wherein the plant control system is configured to analyze the signal representative of the unexpected maintenance event and the historical data to credit the unexpected maintenance event in lieu of performing an equipment test event related to the plant system.
2 Assignments
0 Petitions
Accused Products
Abstract
Embodiments of the present disclosure include systems and a method. In one embodiment, a system is provided. The system includes a risk calculation system configured to calculate a risk based on a static input and a dynamic input, and a decision support system configured to use the risk to derive a decision. The system also includes a plant control system configured to update operations of a plant based on the decision, wherein the decision predicts future plant conditions.
-
Citations
22 Claims
-
1. A system comprising:
-
a risk calculation system programmed to calculate a risk based on a static input and a dynamic input; and a decision support system programmed to use the risk to derive a decision; and a plant control system programmed to update operations of a plant based on the decision, to observe a plant system, and to store plant system observations as historical data, wherein the decision predicts future plant conditions, wherein the static input comprises a business environment data, wherein the dynamic input comprises a signal representative of an unexpected maintenance event, and wherein the plant control system is configured to analyze the signal representative of the unexpected maintenance event and the historical data to credit the unexpected maintenance event in lieu of performing an equipment test event related to the plant system. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9)
-
-
10. A method, comprising:
-
observing a plant system via a plant control system; storing plant system observations as historical data via the plant control system; determining, via the plant control system, an occurrence of an event based on an event rule and a dynamic input associated with at least one component of a plant wherein the event comprises an unexpected maintenance event; and responding, via the plant control system, to the occurrence of the event, if the event occurs, wherein responding comprises; updating a risk projection based on at least one dynamic input; updating a risk threshold based on at least one static input; determining whether the risk projection exceeds the risk threshold; determining a first action if the risk projection exceeds the risk threshold, wherein determining the first action comprises selecting a mitigation action as the first action if one or more mitigation actions are available, or determining a recommended action as the first action if no mitigation actions are available; determining a second action if the risk projection does not exceed the risk threshold, wherein determining the second action comprises calculating a next scheduled action as the second action, wherein the mitigation action comprises using a backup component configured to operate as a backup to the at least one component; and analyzing, via the plant control system, the unexpected maintenance event and the historical data to credit the unexpected maintenance event in lieu of performing an equipment test event related to the plant system. - View Dependent Claims (11, 12, 13, 14, 15, 16, 17, 18, 19)
-
-
20. A system comprising:
a power plant controller programmed to receive dynamic inputs and static inputs related to a power plant, to observe a plant system, and to store plant system observations as historical data, wherein the power plant controller is programmed to derive a decision impacting power plant operations, the power plant controller is programmed to determine when a test of a component of the power plant is recommended based on monitoring the dynamic and static inputs and the historical data, the power plant controller is programmed to identify an occurrence of an unexpected maintenance event related to the test, the plant controller is programmed to analyze the unexpected maintenance event and the historical data to credit the unexpected maintenance event in lieu of performing an equipment test, and the power plant controller is programmed to adjust a test schedule based on the credit. - View Dependent Claims (21, 22)