×

System and method for a demand driven lean production control system

  • US 8,989,879 B2
  • Filed: 09/23/2009
  • Issued: 03/24/2015
  • Est. Priority Date: 09/27/2008
  • Status: Active Grant
First Claim
Patent Images

1. A system, comprising:

  • a database storing production control data associated with one or more entities;

    a production control system coupled with the database and configured to model a production control framework of the one or more entities, the production control system comprising;

    one or more work centers authorizing one or more tasks for one or more parts;

    one or more demand authorization signals generated when a demand is received at the one or more entities;

    one or more work center-specific material authorization signals;

    one or more site-specific material authorization signals;

    one or more pull-based production control signals; and

    one or more manufacturing processes that produce one or more finished parts using the one or more parts.

View all claims
  • 20 Assignments
Timeline View
Assignment View
    ×
    ×