×

Home/building fault analysis system using resource connection map log and method thereof

  • US 9,009,533 B2
  • Filed: 12/21/2012
  • Issued: 04/14/2015
  • Est. Priority Date: 12/29/2011
  • Status: Expired due to Fees
First Claim
Patent Images

1. A home/building fault analysis system comprising:

  • a plurality of resources that include at least one of a plurality of devices running on a processor, networks, and processors running services; and

    a home/building log-based fault management device that is connected with each of the resources via a network to thereby collect information of each of the resources, generates and maintains a resource connection map based on the collected information of each of the resources, compares and analyzes, when a fault is generated, a previous integrated resource state and a current resource state using resource connection map logging information to thereby provide, to a user, state information of the resource in which information having high association with a fault resource is mainly changed, and performs an effective fault analysis and process by restoring the current resource state to the previous resource state, as necessary,wherein the home/building log-based fault management device includesa plurality of resource information collection modules that are connected with the plurality of resources via the network to thereby periodically collect the information of each of the resources,a home/building resource management module that processes resources within a home/building to targets to be managed based on the information of the resources collected from each of the plurality of resource information collection modules, and analyzes a relation between the resources to thereby generate the resource connection map,a local storage module that stores the resource connection map periodically transmitted from the home/building resource management module, and information about resource events, anda fault analysis and state restoration module that compares and analyzes, when a fault is generated, the previous integrated resource state and the current resource state using the resource connection map logging information transmitted from the home/building resource management module to thereby provide, to the user, the state information of the resource in which information having high association with the fault resource is mainly changed, and performs the effective fault analysis and process by restoring the current resource state to the previous resource state, as necessary.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×