Systems and methods for provisioning equipment
First Claim
1. A system for updating building equipment, the system comprising:
- a main control unit including a processing circuit, a memory device, and a data communications interface;
an auxiliary control unit connected with the main control unit via a communications network; and
a portable data storage device physically separate from the main control unit and having an update file stored therein, wherein the update file includes a plurality of partitions, each partition containing provisioning data for a programmable component of the main control unit or the auxiliary control unit and associated metadata;
wherein the processing circuit comprises a provisioning manager configured to identify a first partition of the update file containing first provisioning data targeted for the main control unit using first metadata associated with the first partition and to identify a second partition of the update file containing second provisioning data targeted for the auxiliary control unit using second metadata associated with the second partition;
wherein the processing circuit is configured to extract the provisioning data from the identified partitions and to apply or update the extracted provisioning data to the auxiliary control unit via the communications network and to the memory device of the main control unit.
1 Assignment
0 Petitions
Accused Products
Abstract
Systems and methods for provisioning building equipment are provided. A disclosed provisioning system includes a main control unit having a processing circuit, a memory device, and a data communications interface. The provisioning system further includes an auxiliary control unit and a portable data storage device. The portable data storage device is physically separate from the main control unit and has an update file stored therein. The update file includes a plurality of partitions, each partition including provisioning data and metadata. The main control unit identifies a first partition of the update file containing first provisioning data for the main control unit and a second partition of the update file containing second provisioning data for the auxiliary control unit. The processing circuit is configured to extract the provisioning data from the identified partitions and to apply the extracted provisioning data to the main control unit and the auxiliary control unit.
16 Citations
20 Claims
-
1. A system for updating building equipment, the system comprising:
-
a main control unit including a processing circuit, a memory device, and a data communications interface; an auxiliary control unit connected with the main control unit via a communications network; and a portable data storage device physically separate from the main control unit and having an update file stored therein, wherein the update file includes a plurality of partitions, each partition containing provisioning data for a programmable component of the main control unit or the auxiliary control unit and associated metadata; wherein the processing circuit comprises a provisioning manager configured to identify a first partition of the update file containing first provisioning data targeted for the main control unit using first metadata associated with the first partition and to identify a second partition of the update file containing second provisioning data targeted for the auxiliary control unit using second metadata associated with the second partition; wherein the processing circuit is configured to extract the provisioning data from the identified partitions and to apply or update the extracted provisioning data to the auxiliary control unit via the communications network and to the memory device of the main control unit. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8)
-
-
9. A method for updating building equipment, the method comprising:
-
establishing a communications link between a main control unit and a portable data storage device physically separate from the main control unit, wherein the portable data storage device includes an update file having a plurality of partitions, each partition containing provisioning data and associated metadata; identifying a first partition of the update file containing first provisioning data targeted for a programmable component of the main control unit, wherein the first partition is identified by a provisioning manager of the main control unit using first metadata associated with the first partition; identifying a second partition of the update file containing second provisioning data targeted for a programmable component of an auxiliary control unit connected with the main control unit via a communications network, wherein the second partition is identified by the provisioning manager using second metadata associated with the second partition; extracting the first and second provisioning data from the first and second identified partitions; and applying or updating the first provisioning data to a memory device of the main control unit and applying or updating the second provisioning data to the auxiliary control unit via the communications network. - View Dependent Claims (10, 11, 12, 13, 14)
-
-
15. A method for provisioning building equipment, the method comprising:
-
identifying first provisioning data currently in use by a main control unit, wherein the first provisioning data is identified by a provisioning manager of the main control unit; identifying second provisioning data currently use by an auxiliary control unit connected with the main control unit via a communications network, wherein the second provisioning data is identified by the provisioning manager of the main control unit; receiving, into a memory device of the main control unit, the second provisioning data from the auxiliary control unit; generating first metadata based on the first provisioning data and second metadata based on the second provisioning data; generating a backup file containing the first provisioning data, the first metadata, the second provisioning data, and the second metadata; establishing a communications link between the main control unit and a portable data storage device physically separate from the main control unit; and copying the backup file to the portable data storage device. - View Dependent Claims (16, 17, 18, 19, 20)
-
Specification