Smart charging system for mobile vehicles and method of operating the same
First Claim
1. A charging apparatus connected between a utility grid and an electric vehicle, the charging apparatus comprising:
- a measurement unit connected to the utility grid and configured to measure an output voltage and an output current of the utility grid;
a communication unit configured to receive an output voltage information and an output current information of the utility grid, a charging voltage information and a charging current information of the electric vehicle, and a load condition information of the utility grid;
a control unit connected to the measurement unit and the communication unit;
wherein the control unit configured to control the utility grid to adaptively charge the electric vehicle via a charging connection unit according to the output voltage information, the output current information, the charging voltage information, the charging current information, and the load condition information when the control unit meets a charge authorization condition;
wherein the charge authorization condition is a charging permit authorization mode;
the electric vehicle judges whether to receive the charging permit command according to the output voltage information and the output current information of the utility grid when the utility grid provides a charging permit command to the electric vehicle via the charging apparatus;
wherein the electric vehicle receives the charging permit command when the output voltage and output current of the utility grid meet the required charging voltage and charging current of the electric vehicle.
1 Assignment
0 Petitions
Accused Products
Abstract
A smart charging system for mobile vehicles includes a charging apparatus, a meter, and a cloud server. The charging apparatus is connected between an electric grid and an electric vehicle. The charging apparatus is supplied by the electric grid and then provides power to supply the electric vehicle. The meter is operatively connected between the electric grid and the charging apparatus. The meter has a communication with the electric grid to obtain supplied power from the electric grid to the charging apparatus. The cloud server is operatively connected to the electric grid and further operatively connected to the charging apparatus via a gateway apparatus to receive power-supplying information of the electric grid and power-charging information of the electric vehicle. Further, the charging apparatus smartly charges the electric vehicle according to the power-supplying information and the power-charging information.
14 Citations
17 Claims
-
1. A charging apparatus connected between a utility grid and an electric vehicle, the charging apparatus comprising:
-
a measurement unit connected to the utility grid and configured to measure an output voltage and an output current of the utility grid; a communication unit configured to receive an output voltage information and an output current information of the utility grid, a charging voltage information and a charging current information of the electric vehicle, and a load condition information of the utility grid; a control unit connected to the measurement unit and the communication unit; wherein the control unit configured to control the utility grid to adaptively charge the electric vehicle via a charging connection unit according to the output voltage information, the output current information, the charging voltage information, the charging current information, and the load condition information when the control unit meets a charge authorization condition; wherein the charge authorization condition is a charging permit authorization mode;
the electric vehicle judges whether to receive the charging permit command according to the output voltage information and the output current information of the utility grid when the utility grid provides a charging permit command to the electric vehicle via the charging apparatus;
wherein the electric vehicle receives the charging permit command when the output voltage and output current of the utility grid meet the required charging voltage and charging current of the electric vehicle. - View Dependent Claims (2, 3, 4, 5, 6)
-
-
7. A smart charging system for mobile vehicles comprising:
-
a charging apparatus connected between a utility grid and an electric vehicle;
wherein the charging apparatus is supplied by the utility grid and the electric vehicle is charged by the charging apparatus;a meter operationally connected between the utility gird and the charging apparatus;
wherein the meter is communicated to the utility grid to obtain an output voltage information and an output current information provided from the utility grid to the charging apparatus; anda cloud server operationally connected to the utility grid;
wherein the cloud server is further operationally connected to the charging apparatus via a gateway apparatus to receive the output voltage information and the output current information of the utility grid and a charging voltage information and a charging current information of the electric vehicle;wherein the charging apparatus configured to adaptively charge the electric vehicle according to the output voltage information, the output current information, the charging voltage information, the charging current information, and a load condition information of the utility grid when the charging apparatus meets a charge authorization condition; wherein the charge authorization condition is a charging permit authorization mode;
the electric vehicle judges whether to receive the charging permit command according to the output voltage information and the output current information of the utility grid when the utility grid provides a charging permit command to the electric vehicle via the charging apparatus;
wherein the electric vehicle receives the charging permit command when the output voltage and output current of the utility grid meet the required charging voltage and charging current of the electric vehicle. - View Dependent Claims (8, 9, 10, 11)
-
-
12. A method of smartly charging mobile vehicles for charging an electric vehicle by a utility grid, comprising following steps:
-
(a) providing a charging apparatus, wherein the charging apparatus is connected between the utility grid and the electric vehicle; (b) providing a charging request command from the electric vehicle, wherein the charging request command is sent to the utility grid via the charging apparatus to propose a charging request to the utility grid; (c) providing a charging permit command from the utility grid, wherein the charging permit command is sent to the electric vehicle via the charging apparatus to allow charging the electric vehicle;
wherein when the utility grid provides the charging permit command to the electric vehicle, a charging permit authorization mode is further executed between the electric vehicle, the charging apparatus, and the utility grid;
the electric vehicle judges whether to receive the charging permit command according to the output voltage information and the output current information of the utility grid when the utility grid provides a charging permit command to the electric vehicle via the charging apparatus;
wherein the electric vehicle receives the charging permit command when the output voltage and output current of the utility grid meet the required charging voltage and charging current of the electric vehicle;(d) providing a charging validation command from the electric vehicle, wherein the charging validation command is sent to the utility grid via the charging apparatus to propose a charging notice to the utility grid; and (e) charging the electric vehicle by the utility grid via the charging apparatus. - View Dependent Claims (13, 14, 15, 16, 17)
-
Specification