Automated track surveying and ballast replacement

  • US 9,051,695 B2
  • Filed: 06/17/2014
  • Issued: 06/09/2015
  • Est. Priority Date: 10/18/2011
  • Status: Active Grant
First Claim
Patent Images

1. A method for automated track surveying and ballast replacement and comprising the steps of:

  • (a) moving a survey vehicle along a section of a railway;

    (b) obtaining survey vehicle position coordinates of said survey vehicle at intervals spaced along said section of railway using a survey vehicle position coordinate system and storing said position coordinates in a survey computer system;

    (c) concurrently;

    (1) scanning said railway to obtain position referenced track profile data points at each of said intervals and storing said track profile data points in said survey computer system; and

    (2) recording image data of said railway at each of said intervals using an image recording device and storing said image data in said survey computer system;

    (d) processing said track profile data points to obtain a ballast replacement data file including ballast replacement unit weights per selected unit of length of said railway section, each ballast replacement unit weight being positionally associated with a corresponding unit of said railway section;

    (e) processing said ballast replacement unit weights to detect anomalous unit weights among said ballast replacement unit weights of said data file;

    (f) displaying image data corresponding with any unit of said railway section associated with an anomalous unit weight to enable review of such image data;

    (g) providing access to said anomalous unit weights of said data file to enable adjustment thereof to appropriate levels in response to reviewing image data associated therewith; and

    (h) loading said survey vehicle position coordinates and data representing said unit weights, including adjusted unit weights, into a ballast distribution computer controlling distribution of ballast from ballast distribution cars of a ballast train to thereby distribute said unit weights of ballast to corresponding units of length of said railway section.