Hybrid method of erecting a cold box using prefabricated and field erected components
First Claim
1. A hybrid method of erecting a cold box in the field utilizing prefabricated and field erected components, said method comprising the following steps:
- a. anchoring at least one prefabricated distillation column to a foundation in a substantially vertical orientation;
b. anchoring a pipe rack module to said foundation in a substantially vertical orientation, wherein said pipe rack module is in close proximity to said at least one distillation column;
c. attaching interconnecting piping between said pipe rack module and said at least one distillation column;
d. anchoring at least four corner beams to an edge of said foundation in a substantially vertical orientation;
e. attaching prefabricated panels with bracing to said corner beams, to form an enclosure around said distillation column and piping; and
f. attaching a roof to said enclosure.
2 Assignments
0 Petitions
Accused Products
Abstract
A method of erecting a cold box that includes the steps of anchoring at least one column to a foundation in a substantially vertical orientation; anchoring a pipe rack module to the foundation in a substantially vertical orientation, wherein the pipe rack module is in close proximity to the at least one column; attaching interconnecting piping between the pipe rack module and the at least one column; anchoring at least four corner beams to the edge of the foundation in a substantially vertical orientation; attaching prefabricated panels with bracing to the corner beams, to form an enclosure around the column and piping; and attaching a roof to the enclose is provided.
15 Citations
5 Claims
-
1. A hybrid method of erecting a cold box in the field utilizing prefabricated and field erected components, said method comprising the following steps:
-
a. anchoring at least one prefabricated distillation column to a foundation in a substantially vertical orientation; b. anchoring a pipe rack module to said foundation in a substantially vertical orientation, wherein said pipe rack module is in close proximity to said at least one distillation column; c. attaching interconnecting piping between said pipe rack module and said at least one distillation column; d. anchoring at least four corner beams to an edge of said foundation in a substantially vertical orientation; e. attaching prefabricated panels with bracing to said corner beams, to form an enclosure around said distillation column and piping; and f. attaching a roof to said enclosure. - View Dependent Claims (2, 3, 4, 5)
-
Specification