System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management

  • US 9,069,337 B2
  • Filed: 03/04/2013
  • Issued: 06/30/2015
  • Est. Priority Date: 08/28/2007
  • Status: Active Grant
First Claim
Patent Images

1. A method for estimating operating reserve of a utility servicing one or more service points, the method comprising:

  • determining amounts of electric power consumed by at least one device during multiple periods of time to produce power consumption data, the at least one device being located at the one or more service points;

    storing the power consumption data in a repository;

    determining that a control event is to occur during which a supply of electric power is to be reduced to the at least one device;

    after storage of the power consumption data in the repository and prior to commencement of the control event, estimating, under an assumption that the control event is not to occur, power consumption behavior expected of the at least one device during a future period of time based at least on the stored power consumption data, wherein the control event is expected to occur during the future period of time;

    determining, prior to commencement of the control event, energy savings expected to result from the control event based at least on the estimated power consumption behavior of the at least one device to produce projected energy savings; and

    determining, prior to commencement of the control event, an amount of available operating reserve based on the projected energy savings;

    wherein determining energy savings expected to result from the control event includes;

    determining an amount of power expected to be consumed by the at least one device during the future period of time absent occurrence of the control event to produce first energy savings;

    determining an amount of power that is not expected to be dissipated in transmission lines as a result of withholding delivery of power to the at least one device during the control event to produce second energy savings; and

    summing the first energy savings and the second energy savings.