System tools for integrating individual load forecasts into a composite load forecast to present a comprehensive synchronized and harmonized load forecast
First Claim
Patent Images
1. A system, comprising:
- a memory that stores executable instructions; and
a processor, coupled to the memory, that executes or facilitates execution of the executable instructions to at least;
receive at least two different load forecasts related to a power grid center that are determined based on a first forecast engine associated with a first time range, a second forecast engine associated with a second time range, and a third forecast engine associated with a third time range;
integrate the at least two different load forecasts into a composite load forecast for the power grid center based at least in part on a weighted average of the at least two different load forecasts that are determined based on the first forecast engine, the second forecast engine and the third forecast engine; and
prepare a comprehensive operating plan for the power grid center based on the composite load forecast, daily scheduling data for the power grid center that is determined by the first forecast engine, timing data for at least one power generator that is determined by the second forecast engine, and financial data for the power grid center that is determined by the third forecast engine, wherein the comprehensive operating plan comprises scheduling data for a component of the power grid center.
3 Assignments
0 Petitions
Accused Products
Abstract
A system tool merges different load forecasts for power grid centers. A plurality of load forecast engines are coupled to a load forecast interface and a relational data base that saves load forecast engine data as an input through the load forecast interface. A comprehensive operating plan is coupled to the load forecast engines and the relational database. The comprehensive operating plan is configured to integrate individual load forecasts into a composite load forecast to present a comprehensive, synchronized and harmonized load forecast. A program interface provides access to the composite load forecasting schedule.
-
Citations
19 Claims
-
1. A system, comprising:
-
a memory that stores executable instructions; and a processor, coupled to the memory, that executes or facilitates execution of the executable instructions to at least; receive at least two different load forecasts related to a power grid center that are determined based on a first forecast engine associated with a first time range, a second forecast engine associated with a second time range, and a third forecast engine associated with a third time range; integrate the at least two different load forecasts into a composite load forecast for the power grid center based at least in part on a weighted average of the at least two different load forecasts that are determined based on the first forecast engine, the second forecast engine and the third forecast engine; and prepare a comprehensive operating plan for the power grid center based on the composite load forecast, daily scheduling data for the power grid center that is determined by the first forecast engine, timing data for at least one power generator that is determined by the second forecast engine, and financial data for the power grid center that is determined by the third forecast engine, wherein the comprehensive operating plan comprises scheduling data for a component of the power grid center. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
-
8. A computer readable storage device comprising computer-executable instructions that, in response to execution, cause an apparatus comprising a processor, to perform operations, comprising:
-
receiving a plurality of different load forecasts related to a power grid center, wherein the plurality of different load forecasts are determined based on a first load forecast engine associated with a first time period, a second load forecast engine associated with a second time period, and a third load forecast engine associated with a third time period; merging the plurality of different load forecasts into a composite load forecast for the power grid center based at least in part on a weighted average of the plurality of different load forecasts that are determined based on the first load forecast engine, the second load forecast engine and the third load forecast engine; and preparing a comprehensive operating plan for the power grid center based on the composite load forecast, daily scheduling data for the power grid center that is determined by the first load forecast engine, timing data for at least one power unit that is determined by the second load forecast engine, and cost data for the power grid center that is determined by the third load forecast engine, wherein the comprehensive operating plan comprises scheduling data for a component of the power grid center. - View Dependent Claims (9, 10, 11, 12, 13, 19)
-
-
14. A method, comprising:
-
receiving, by a system comprising a processor, at least two different load forecasts related to a power grid center, wherein the at least two different load forecasts are associated with a first forecast engine corresponding to a first time period, a second forecast engine corresponding to a second time period, and a third forecast engine corresponding to a third time period; synthesizing, by the system, the at least two different load forecasts into a composite load forecast based at least in part on a weighted average of the at least two different load forecasts that are associated with the first forecast engine, the second forecast engine and the third forecast engine; generating, by the system, a comprehensive operating plan for the power grid center based on the composite load forecast, daily scheduling data for the power grid center that is generated by the first forecast engine, timing data for at least one power generator that is generated by the second forecast engine, and financial data for the power grid center that is generated by the third forecast engine, wherein the comprehensive operating plan comprises scheduling data for a component of the power grid center; and performing, by the system, a system dispatch based on the comprehensive operating plan. - View Dependent Claims (15, 16, 17, 18)
-
Specification