×

Power management arrangement and method in a utility meter

  • US 9,110,108 B2
  • Filed: 05/04/2012
  • Issued: 08/18/2015
  • Est. Priority Date: 05/04/2012
  • Status: Active Grant
First Claim
Patent Images

1. A system for use in a utility meter, comprising:

  • a utility meter housing including metrology circuitry configured to generate metering data regarding electrical power provided to the load, the utility meter including a connection to the utility power service;

    a power supply;

    a non-volatile memory;

    an energy storage device operably coupled to the power supply;

    a control circuit operably coupled to receive power generated by the power supply and receive power from the energy storage device, the control circuit configured to,perform a start-up operation responsive to receiving a first bias power signal;

    erase first metering information stored in the non-volatile memory during the start-up operation;

    process, subsequent to erasing the first memory location and after completion of the start-up operation, metering data received from the metrology circuit to generate second metering information;

    receive a first interruption signal indicative of an interruption of power in the power supply;

    store, responsive to receiving the first interruption signal, second metering information in the non-volatile memory using power from the energy storage device.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×