×

Offshore universal riser system

  • US 9,127,511 B2
  • Filed: 07/06/2012
  • Issued: 09/08/2015
  • Est. Priority Date: 11/07/2006
  • Status: Active Grant
First Claim
Patent Images

1. A method of pressure testing a riser string, the method comprising:

  • installing a valve module into an internal longitudinal flow passage extending through the riser string between a blowout preventer stack and a diverter;

    closing the valve module to thereby prevent fluid flow through the flow passage;

    securing a tubular string within the riser string by an anchoring device in engagement with the riser string; and

    applying a pressure differential across the closed valve module via the tubular string, thereby pressure testing at least a portion of the riser string.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×