×

Fast pressure protection system and method

  • US 9,127,526 B2
  • Filed: 12/03/2012
  • Issued: 09/08/2015
  • Est. Priority Date: 12/03/2012
  • Status: Active Grant
First Claim
Patent Images

1. A wellbore servicing system, the system comprising:

  • at least one wellbore servicing equipment component, wherein a flow path extends from the wellbore servicing system component into a wellbore penetrating a subterranean formation; and

    a pressure control system in fluid communication with the flow path, wherein the pressure control system comprises;

    a relief path configured to communicate fluid through the pressure control system,a pressure control device configured to permit fluid communication between the flow path and the relief path upon experiencing a pressure and/or a differential pressure of at least a predetermined pressure threshold;

    a first valve disposed along the relief path and downstream of the pressure control device, wherein the first valve is configured to actuate from a first valve open configuration to a first valve closed configuration and to prevent fluid communication through the relief path when the first valve is in the first valve closed configuration; and

    a second valve disposed within the relief path downstream from the first valve, wherein the second valve is configured to actuate from a second valve open configuration to a second valve closed configuration.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×