Method and control and tracking system of the charge of material transported by a continuous supply conveyor of a metallurgical furnace, particularly an electric furnace for the production of steel

  • US 9,139,377 B2
  • Filed: 08/15/2011
  • Issued: 09/22/2015
  • Est. Priority Date: 08/18/2010
  • Status: Active Grant
First Claim
Patent Images

1. A control and tracking method of a charge of material transported by a continuous supply conveyor of a metallurgical furnace, or an electric furnace for production of steel, wherein the continuous conveyor includes, in sequence and starting from its inlet end towards its outlet end, a loading section of the charge of material to be supplied to the furnace, a preheating section of the charge of material loaded, and an introduction section into the furnace of the preheated charge of material, and along the loading section at least a first loading station of material, the method comprising:

  • a) determining a type and weight of the material of a first charge fraction to be loaded in the first loading station in function of a predetermined charge recipe;

    b) supplying the first loading station with the first charge fraction;

    c) detecting a weight of the first charge fraction;

    d) discharging the first charge fraction on the continuous conveyor;

    e) marking the first charge fraction through identification means;

    f) detecting overall dimensions of the first charge fraction discharged on the continuous conveyor;

    g) estimating an advancing speed of the first charge fraction along the loading section of the continuous conveyor and an arrival time of the first charge fraction entering a possibly subsequent loading station of a further charge fraction or the preheating section;

    h) in proximity to the inlet to the preheating section, recognizing in the charge of material discharged onto the continuous conveyor, the first charge fraction and possible further charge fractions subsequently discharged onto the continuous conveyor by the respective identification means;

    i) estimating an advancing speed of the first charge fraction and of possible further charge fractions subsequently discharged onto the continuous conveyor along the preheating section and the respective arrival time at the inlet section into the furnace,wherein along the loading section at least a n-th loading station subsequent to the loading station is present, where n>

    2, the method further comprising;

    a′

    ) determining a type and weight of material of the n-th charge fraction to be loaded in the n-th loading station in function of the predetermined charge recipe;

    b′

    ) supplying the n-th loading station with the n-th charge fraction;

    c′

    ) determining a weight of the n-th charge fraction;

    d′

    ) discharging the n-th charge fraction onto the continuous conveyor;

    e′

    ) marking the n-th charge fraction through respective identification means;

    f′

    ) detecting overall dimensions of the charge of material discharged onto the continuous conveyor and exiting from the n-th loading station;

    g′

    ) estimating an advancing speed of the charge of material discharged onto the continuous conveyor and exiting from the n-th loading station along the loading section and an arrival time of the charge of material exiting from the n-th loading station entering a possible subsequent loading station of a further charge fraction or to the preheating section,wherein prior to the discharge d′

    ), the method further comprising;

    I) recognizing in the charge of material entering the n-th loading station the n−

    1 charge fractions discharged in the preceding loading stations by the respective identification means;

    II) detecting the actual overall dimensions of the charge of material entering the n-th loading station;

    III) estimating with respect to the charge entering the n-th loading station the position at which performing the discharge of the n-th charge fraction, in function of the actual overall dimensions of the charge of material entering the n-th loading station and of the distribution of the charge fractions previously discharged on the continuous conveyor;

    IV) estimating the advancing speed of the charge of material entering the n-th loading station along the loading section and the arrival time of the estimated discharge position to the n-th loading station;

    V) verifying the correspondence between the discharge position with the n-th loading station,wherein the detecting f) of the overall dimensions of the first charge fraction, of the charge entering II) and exiting from the n-th loading station f′

    ) and of the charge entering the preheating section i) comprises acquisition of a profile of the charges at least on a plane transversal to the advancing direction of the continuous conveyor.

View all claims