Transportable single operator rig apparatus and method for optimizing drilling and/or completion
First Claim
1. An apparatus comprising:
- a. a carrier;
b. a mast pivotally mounted on said carrier for rotation upward to an erect drilling position, said mast comprising;
i. front vertical support members and rear vertical support members; and
ii. a mast top supported atop said front and rear vertical support members; and
c. a drawworks mounted on said carrier to said rear of an erect mast, said drawworks having a drum with a drum rotation axis perpendicular to a drilling axis for winding and unwinding a drilling line on said drum;
d. a crown block assembly mounted in a mast top for engaging said drilling line, wherein said crown block assembly comprises;
i. a cluster of front sheaves mounted at a front of said mast top facing said drilling axis, said cluster of front sheaves comprising a first outermost sheave and a second outermost sheaves and at least one inboard sheave, all aligned on an axis in a plane perpendicular to said drilling axis and having a predetermined distance between grooves of adjacent front sheaves of the cluster of front sheaves;
ii. a fast line sheave mounted on said drawworks side of said mast top, behind a first outermost front sheave and on an axis substantially parallel to said front sheave axis, for reeving said drilling line to said first outermost front sheave; and
iii. a deadline sheave mounted on said drawworks side of said mast top, behind a second outermost front sheave and on an axis substantially parallel to said front sheave axis, for reeving said drilling line from said second outermost front sheave to an anchorage; and
e. a traveling block assembly hung by said drilling line from said cluster of front sheaves of said crown block assembly, comprising;
i. a frame;
a cluster of traveling block sheaves comprising at least a first travelling block sheave, a first outermost traveling block sheave and a second outermost traveling block sheave, wherein said cluster of traveling block sheaves is supported in said frame and is one less in number than the cluster of front sheaves in said crown block assembly,1. said cluster of traveling block sheaves having a predetermined distance between grooves of adjacent traveling block sheaves and rotating on a common horizontal axis in a plane perpendicular to said drilling axis, and2. said traveling sheave axis being angled in said latter plane relative to said axis of said cluster of front sheaves such that said drilling line reeves downwardly from said groove in a first front sheave parallel to said drilling axis to engage said groove in said at least first traveling block sheave and reeves upwardly from said groove in said first traveling block sheave toward said second front sheave next adjacent said first front sheave at an up-going drilling line angle to said drilling axis effective according to said distance between said grooves of said first and second front sheaves to move said drilling line laterally relative to said front sheave axis and engage said groove of said second front sheave, each traveling block sheave of said cluster of traveling block sheaves receiving said drilling line parallel to said drilling axis and reeving said drilling line to each following front sheave at said up-going angle, andiii. said first outermost traveling block sheave receiving said drilling line, reeved downward from said first outermost front sheave of said crown block assembly parallel to said drilling axis, reeves said drilling line at said up-going angle to a next adjacent inboard front sheave, a latter inboard front sheave reeves said drilling line downward to a traveling block sheave next adjacent said first outermost traveling block sheave parallel to said drilling axis, said traveling block sheave next adjacent reeves said drilling line at said up-going angle to a front sheave next adjacent to said front sheave next adjacent to said first outermost front sheave, and so forth, for each successive traveling block sheave, until said second outermost traveling block sheave reeves said drilling line at said up-going angle to said second outermost front sheave,wherein said second outermost front sheave reeves said drilling line to said deadline sheave, and wherein said deadline sheave reeves said drilling line to said anchorage.
8 Assignments
0 Petitions
Accused Products
Abstract
A transportable rig apparatus provides single operator control for moving pipe into and out of a wellbore. A transportable control van houses the operator. A rig carrier is utilized to transport the mast. A pipe tong is mounted in the mast and is remotely operable from the control van. Rig blocks which move up and down in the mast are remotely operable from control van. A skid mounted pipe moving member moves pipe to the mast assembly and away from the mast assembly. The pipe moving member remotely is operable from the control van. A pipe tub stores pipe and a pipe tub transfer system is operable for moving pipe from the pipe tub to the pipe moving member and for moving pipe from the pipe moving member to the pipe tub.
-
Citations
20 Claims
-
1. An apparatus comprising:
-
a. a carrier; b. a mast pivotally mounted on said carrier for rotation upward to an erect drilling position, said mast comprising; i. front vertical support members and rear vertical support members; and ii. a mast top supported atop said front and rear vertical support members; and c. a drawworks mounted on said carrier to said rear of an erect mast, said drawworks having a drum with a drum rotation axis perpendicular to a drilling axis for winding and unwinding a drilling line on said drum; d. a crown block assembly mounted in a mast top for engaging said drilling line, wherein said crown block assembly comprises; i. a cluster of front sheaves mounted at a front of said mast top facing said drilling axis, said cluster of front sheaves comprising a first outermost sheave and a second outermost sheaves and at least one inboard sheave, all aligned on an axis in a plane perpendicular to said drilling axis and having a predetermined distance between grooves of adjacent front sheaves of the cluster of front sheaves; ii. a fast line sheave mounted on said drawworks side of said mast top, behind a first outermost front sheave and on an axis substantially parallel to said front sheave axis, for reeving said drilling line to said first outermost front sheave; and iii. a deadline sheave mounted on said drawworks side of said mast top, behind a second outermost front sheave and on an axis substantially parallel to said front sheave axis, for reeving said drilling line from said second outermost front sheave to an anchorage; and e. a traveling block assembly hung by said drilling line from said cluster of front sheaves of said crown block assembly, comprising; i. a frame; a cluster of traveling block sheaves comprising at least a first travelling block sheave, a first outermost traveling block sheave and a second outermost traveling block sheave, wherein said cluster of traveling block sheaves is supported in said frame and is one less in number than the cluster of front sheaves in said crown block assembly, 1. said cluster of traveling block sheaves having a predetermined distance between grooves of adjacent traveling block sheaves and rotating on a common horizontal axis in a plane perpendicular to said drilling axis, and 2. said traveling sheave axis being angled in said latter plane relative to said axis of said cluster of front sheaves such that said drilling line reeves downwardly from said groove in a first front sheave parallel to said drilling axis to engage said groove in said at least first traveling block sheave and reeves upwardly from said groove in said first traveling block sheave toward said second front sheave next adjacent said first front sheave at an up-going drilling line angle to said drilling axis effective according to said distance between said grooves of said first and second front sheaves to move said drilling line laterally relative to said front sheave axis and engage said groove of said second front sheave, each traveling block sheave of said cluster of traveling block sheaves receiving said drilling line parallel to said drilling axis and reeving said drilling line to each following front sheave at said up-going angle, and iii. said first outermost traveling block sheave receiving said drilling line, reeved downward from said first outermost front sheave of said crown block assembly parallel to said drilling axis, reeves said drilling line at said up-going angle to a next adjacent inboard front sheave, a latter inboard front sheave reeves said drilling line downward to a traveling block sheave next adjacent said first outermost traveling block sheave parallel to said drilling axis, said traveling block sheave next adjacent reeves said drilling line at said up-going angle to a front sheave next adjacent to said front sheave next adjacent to said first outermost front sheave, and so forth, for each successive traveling block sheave, until said second outermost traveling block sheave reeves said drilling line at said up-going angle to said second outermost front sheave, wherein said second outermost front sheave reeves said drilling line to said deadline sheave, and wherein said deadline sheave reeves said drilling line to said anchorage. - View Dependent Claims (2, 7, 8, 9, 10, 11)
-
- 3. The apparatus of claim further comprising a guide frame moveable along said guide rails on rollers engaging said guide rails.
-
12. A method of moving a top drive vertically along a drilling axis, comprising:
-
a. providing a guide frame moveable on rollers engaging guide rails parallel to said drilling axis in front of and between said guide rails, said guide rails being connected to front vertical support members of an erect mast; b. providing a traveling block assembly hung by a drilling line from a crown block assembly on a mast top of said mast, said traveling block assembly comprising a frame supporting a cluster of traveling block sheaves, said frame including downwardly projecting extensions laterally outwardly attached to said guide frame, said downwardly projecting extensions mounting said top drive aligned with said drilling axis between said downwardly projecting extensions; c. providing a drawworks to a rear of said erect mast, said drawworks having a drum with a drum rotation axis perpendicular to said drilling axis for winding and unwinding a drilling line on said drum; d. providing said crown block assembly mounted in said mast top for engaging said drilling line, wherein said crown block assembly comprises; i. a cluster of front sheaves mounted at a front of said mast top facing said drilling axis, said cluster of front sheaves comprising a first outermost front sheave, a second outermost front sheaves and at least one inboard sheave, all aligned on an axis in a plane perpendicular to said drilling axis and having a predetermined distance between grooves of adjacent front sheaves of said cluster of front sheaves; ii. a fast line sheave mounted on a drawworks side of said mast top, behind a first outermost front sheave, and on an axis substantially parallel to said front sheaves axis, for reeving said drilling line to said first outermost front sheave; and iii. a deadline sheave mounted on said drawworks side of said mast top, behind a second outermost front sheave, and on an axis substantially parallel to said front sheaves axis, for reeving said drilling line from said second outermost front sheave to an anchorage, wherein said cluster of traveling block sheaves numbers one less than said cluster of said front sheaves in said crown block assembly and includes at least a first traveling block sheave and a second traveling block sheaves, at least one of said first traveling block sheave and said second traveling block sheaves having a predetermined distance between grooves of adjacent traveling sheaves and rotating on a common horizontal axis in a plane perpendicular to said drilling axis, wherein said traveling sheaves axis is angled in said latter plane relative to said axis of said front sheaves such that said drilling line reeves downwardly from a groove in a first front sheave parallel to said drilling axis to engage a groove in a first traveling block sheave and reeves upwardly from said groove in said first traveling block sheave toward said second front sheave next adjacent said first front sheave at an up-going drilling line angle to said drilling axis effective according to said distance between said grooves of said first and second front sheaves to move said drilling line laterally relative to said front sheave axis and engage said groove of said second front sheave, each said traveling block sheave of said cluster of traveling block sheaves receiving said drilling line parallel to said drilling axis and reeving said drilling line to each following front sheave at said up-going angle, wherein said first outermost traveling block sheave receiving said drilling line, reeved downward from said first outermost front sheave of said crown block assembly parallel to said drilling axis, reeves said drilling line at said up-going angle to a next adjacent inboard front sheave, a latter inboard front sheave reeves said drilling line downward to said traveling block sheave next adjacent said first outermost traveling block sheave parallel to said drilling axis, wherein said traveling block sheave next adjacent reeves said drilling line at a-said up-going angle to a front sheave next adjacent to said front sheave next adjacent to said first outermost front sheave, and so forth, for each successive traveling block sheave, until said second outermost traveling block sheave reeves said drilling line at said up-going angle to said second outermost front sheave, wherein said second outermost front sheave reeves said drilling line to said deadline sheave, and wherein said deadline sheave reeves said drilling line to said anchorage; e. providing motive power to said drawworks to wind said drilling line on said drawworks drum to raise said traveling block assembly and said frame mounting said top drive and said guide frame, guiding said top drive along said drilling axis by rolling said guide frame on said rollers along said guide rails; and f. providing motive power to said drawworks to unwind said drilling line on said drawworks drum to lower said traveling block assembly and said frame mounting said top drive and said guide frame, guiding said top drive along said drilling axis by rolling said guide frame along said guide rails. - View Dependent Claims (13, 14, 15, 16, 17, 18, 19, 20)
-
Specification