Method and system for property damage analysis
First Claim
1. A method for property repair analysis, comprising:
- receiving, by an at least one network communications interface of a computer, digital inspection data of a building facet of a property;
receiving, by the at least one network communications interface of the computer, a first layer of geographic-based guideline data, the first layer including a plurality of guideline data items;
receiving, by the at least one network communications interface of the computer, a second layer of geographic-based guideline data;
compressing the first layer of geographic-based guideline data and the second layer of geographic-based guideline data;
during the compressing, determining that a first conflict exists between a first guideline data item of the first layer of geographic-based guideline data and a first guideline data item of the second layer of geographic-based guideline data;
reconciling the first conflict to generate a resulting guideline data item, wherein reconciling the first conflict comprises;
determining that the first layer of geographic-based guideline data is more local as compared to the second layer of geographic-based guideline data; and
based on determining that the first layer of geographic-based guideline data is more local as compared to the second layer of geographic-based guideline data, selecting the first guideline data item of the first layer of geographic-based guideline data over the first guideline data item of the second layer of geographic-based guideline data to be included in the resulting guideline data item;
determining a repair indicator for the building facet based at least in part on the resulting guideline data item and the digital inspection data; and
sending, using the at least one network communications interface of the computer, an electronic message, the electronic message including at least a portion of the digital inspection data and the repair indicator.
7 Assignments
0 Petitions
Accused Products
Abstract
A system and method for intelligently combining CAD, inspection, and building guideline data for intelligently setting roof facet directionality, analyzing repair and replacement decisions and estimating material, material waste and recyclables, material recycling requirements, and repair or replacement costs for building facets is described. One embodiment includes receiving digital inspection data of a building facet of a property; receiving a first layer of geographic-based guideline data; receiving a second layer of geographic-based guideline data; reconciling a conflict between guideline data of the first and second layers of guideline data to reach a resulting guideline data item; determining a repair indicator for the building facet based at least in part on the resulting guideline data item and the digital inspection data; and sending an electronic message, wherein the electronic message includes at least a portion of the digital inspection data and the repair indicator.
-
Citations
20 Claims
-
1. A method for property repair analysis, comprising:
-
receiving, by an at least one network communications interface of a computer, digital inspection data of a building facet of a property; receiving, by the at least one network communications interface of the computer, a first layer of geographic-based guideline data, the first layer including a plurality of guideline data items; receiving, by the at least one network communications interface of the computer, a second layer of geographic-based guideline data; compressing the first layer of geographic-based guideline data and the second layer of geographic-based guideline data; during the compressing, determining that a first conflict exists between a first guideline data item of the first layer of geographic-based guideline data and a first guideline data item of the second layer of geographic-based guideline data; reconciling the first conflict to generate a resulting guideline data item, wherein reconciling the first conflict comprises; determining that the first layer of geographic-based guideline data is more local as compared to the second layer of geographic-based guideline data; and based on determining that the first layer of geographic-based guideline data is more local as compared to the second layer of geographic-based guideline data, selecting the first guideline data item of the first layer of geographic-based guideline data over the first guideline data item of the second layer of geographic-based guideline data to be included in the resulting guideline data item; determining a repair indicator for the building facet based at least in part on the resulting guideline data item and the digital inspection data; and sending, using the at least one network communications interface of the computer, an electronic message, the electronic message including at least a portion of the digital inspection data and the repair indicator. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10)
-
-
11. A non-transitory computer-readable storage medium containing a plurality of program instructions executable by a processor of a computer for property repair analysis, the plurality of program instructions comprising:
-
a first set of instructions configured to cause the computer to receive digital inspection data of a building facet of a property; a second set of instructions configured to cause the computer to receive a first layer of geographic-based guideline data, the first layer including a plurality of guideline data items; a third set of instructions configured to cause the computer to receive, using the at least one network communication interface, a second layer of geographic-based guideline data; a fourth set of instructions configured to compress the first layer of geographic-based guideline data and the second layer of geographic-based guideline data and during such compression determine that a first conflict exists between a first guideline data item of the first layer of geographic-based guideline data and a first guideline data item of the second layer of geographic-based guideline data; a fifth set of instructions configured to cause the computer to reconcile, using the at least one processor, the first conflict to generate a resulting guideline data item, wherein the first conflict is reconciled by determining that the first layer of geographic-based guideline data is more local as compared to the second layer of geographic-based guideline data and then the first guideline data item of the first layer of geographic-based guideline data is selected over the first guideline data item of the second layer of geographic-based guideline data to be included in the resulting guideline data item; a sixth set of instructions configured to cause the computer to determine, using the at least one processor, a repair indicator for the building facet based at least in part on the resulting guideline data item and the digital inspection data; and a seventh set of instructions configured to cause the computer to send, using the at least one network communication interface, an electronic message, electronic message including at least a portion of the digital inspection data and the repair indicator. - View Dependent Claims (12, 13, 14, 15, 16, 17, 18, 19)
-
-
20. A system for property repair analysis, comprising:
-
at least one processor; at least one network communications interface; a memory containing a plurality of instructions configured to cause the at least one processor to; receive, using the at least one network communications interface, digital inspection data of a building facet of a property; receive, using the at least one network communications interface, a first layer of geographic-based guideline data, the first layer including a plurality of guideline data items; receive, using the at least one network communication interface, a second layer of geographic-based guideline data; compress the first layer of geographic-based guideline data and the second layer of geographic-based guideline data and determine during the compression that a first conflict exists between a first guideline data item of the first layer of geographic-based guideline data and a first guideline data item of the second layer of geographic-based guideline data; reconcile, using the at least one processor, the first conflict to generate a resulting guideline data item, wherein the first conflict is reconciled by determining that the first layer of geographic-based guideline data is more local as compared to the second layer of geographic-based guideline data and then the first guideline data item of the first layer of geographic-based guideline data is selected over the first guideline data item of the second layer of geographic-based guideline data to be included in the resulting guideline data item; determine, using the at least one processor, a repair indicator for the building facet based at least in part on the resulting guideline data item and the digital inspection data; and send, using the at least one network communications interface, an electronic message, the electronic message including at least a portion of the digital inspection data and the repair indicator.
-
Specification