×

Battery charge management using usage profiling

  • US 9,197,092 B2
  • Filed: 10/30/2012
  • Issued: 11/24/2015
  • Est. Priority Date: 10/30/2012
  • Status: Active Grant
First Claim
Patent Images

1. A system comprising:

  • a processor;

    a data bus coupled to the processor; and

    a non-transitory, computer-readable storage medium embodying computer program code, the non-transitory, computer-readable storage medium being coupled to the data bus, the computer program code interacting with a plurality of computer operations and comprising instructions executable by the processor and configured for;

    calculating an expected run time for the system;

    determining a system run start value and a system run end value;

    determining whether the expected run time of the system extends beyond the system run end value; and

    when the expected run time of the system extends beyond the system run end value charging the battery to a substantially charged state by topping off the battery to a fully charged state slightly before the system run start value of a next subsequent period.

View all claims
  • 14 Assignments
Timeline View
Assignment View
    ×
    ×