Triple activity drilling ship

  • US 9,217,302 B2
  • Filed: 12/01/2014
  • Issued: 12/22/2015
  • Est. Priority Date: 06/30/2006
  • Status: Active Grant
First Claim
Patent Images

1. A method comprising:

  • making and connecting tubulars on a ship while the ship is en route to a drilling site;

    extending said tubulars below said ship before arriving at the drilling site and while en route to said site;

    running a marine riser and blowout preventer into the sea from a first tubular handling center;

    at the same time the marine riser and blowout preventer are being run, running a conductor; and

    refraining from running said marine riser and blowout preventer when said conductor is in contact with the seabed floor.