Hybrid construction machine
First Claim
1. A hybrid construction machine comprising:
- a hydraulic actuator;
a hydraulic pump which provides hydraulic power to the hydraulic actuator;
a generator-motor which performs an electric generator action for generating electric power and an electric motor action for providing assist power to assist the engine;
an engine which provides driving power to the hydraulic pump and the generator-motor, the engine connected to the generator-motor to receive the assist power from the generator-motor;
an electric actuator which generates regenerative electric power;
an electrical storage device which performs a charge-and-discharge action of supplying and receiving electric power to and from the generator-motor and the electric actuator;
a charge rate detector which detects a charge rate C1 of the electrical storage device; and
a control section which controls an operation of the generator-motor and the charge-and-discharge action of the electrical storage device, whereinwhen the charge rate C1 detected by the charge rate detector is greater than a predetermined charge rate Cs at which the electrical storage device is likely to be overcharged by receiving the regenerative electric power generated by the electric actuator, the control section performs overcharge-prevention control of making the assist power greater than that when C1≦
Cs.
1 Assignment
0 Petitions
Accused Products
Abstract
Provided is a hybrid construction machine preventing an electrical storage device from overcharge, including a hydraulic actuator, a hydraulic pump, a generator-motor which performs electric generator and motor actions, an engine, an electric actuator which generates regenerative electric power, an electrical storage device which performs a charge-and-discharge action with the generator-motor and the electric actuator, a charge-rate detector which detects a charge rate C1 of the electrical storage device, and a control section which controls an operation of the generator-motor and a charge-and-discharge action of the electrical storage device. The control section, when the charge rate C1 exceeds a set value Cs, performs overcharge-prevention control of making assist power by the electric motor action of the generator-motor be greater than that when C1≦Cs, the set value Cs predetermined as a charge rate at which receiving the regenerative electric power can overcharge the electrical storage device.
11 Citations
7 Claims
-
1. A hybrid construction machine comprising:
-
a hydraulic actuator; a hydraulic pump which provides hydraulic power to the hydraulic actuator; a generator-motor which performs an electric generator action for generating electric power and an electric motor action for providing assist power to assist the engine; an engine which provides driving power to the hydraulic pump and the generator-motor, the engine connected to the generator-motor to receive the assist power from the generator-motor; an electric actuator which generates regenerative electric power; an electrical storage device which performs a charge-and-discharge action of supplying and receiving electric power to and from the generator-motor and the electric actuator; a charge rate detector which detects a charge rate C1 of the electrical storage device; and a control section which controls an operation of the generator-motor and the charge-and-discharge action of the electrical storage device, wherein when the charge rate C1 detected by the charge rate detector is greater than a predetermined charge rate Cs at which the electrical storage device is likely to be overcharged by receiving the regenerative electric power generated by the electric actuator, the control section performs overcharge-prevention control of making the assist power greater than that when C1≦
Cs. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
Specification