Method of deploying a mobile rig system
First Claim
1. A method for deploying a mobile rig system to a well site, comprising:
- transporting a control van to said well site for controlling drilling operations at said well site;
transporting a mast assembly to said well site utilizing a rig carrier, wherein said rig carrier comprises motorized pumps and power sources for raising and lowering the mast assembly on said rig carrier and operating a plurality of rig components on said mobile rig system, and wherein said mast assembly is on said rig carrier and is movable between a lowered position with respect to said rig carrier and an upright position with respect to said rig carrier;
positioning said mast assembly adjacent a wellhead at said well site using sensors mounted to rear of said rig carrier;
raising said mast assembly to said upright position, wherein said mast assembly is remotely operable from said control van using said motorized pumps and said power sources;
transporting a pipe moving member mounted to a skid, wherein said pipe moving member is operable for moving pipe to said mast assembly and away from said mast assembly, wherein said pipe moving member is remotely operable from said control van; and
transporting at least one pipe tub for storing pipe and positioning said pipe tub adjacent said pipe moving member mounted to said skid.
9 Assignments
0 Petitions
Accused Products
Abstract
A method for deploying a mobile rig system to a well site includes transporting a control van to the well site. A rig carrier is utilized to transport the mast assembly and position the mast adjacent a wellhead. A skid mounted pipe moving member is transported to the well site and positioned on an opposite end of the wellhead from the mast assembly. The skid is interconnected to the rig carrier for maintaining a fixed distance between the mast assembly and the pipe moving member. A carrier support member is fastened at the interconnection point and extends outward to stabilize the mast assembly. Hydraulic actuators are utilized to level the mast assembly with a ground surface.
36 Citations
20 Claims
-
1. A method for deploying a mobile rig system to a well site, comprising:
-
transporting a control van to said well site for controlling drilling operations at said well site; transporting a mast assembly to said well site utilizing a rig carrier, wherein said rig carrier comprises motorized pumps and power sources for raising and lowering the mast assembly on said rig carrier and operating a plurality of rig components on said mobile rig system, and wherein said mast assembly is on said rig carrier and is movable between a lowered position with respect to said rig carrier and an upright position with respect to said rig carrier; positioning said mast assembly adjacent a wellhead at said well site using sensors mounted to rear of said rig carrier; raising said mast assembly to said upright position, wherein said mast assembly is remotely operable from said control van using said motorized pumps and said power sources; transporting a pipe moving member mounted to a skid, wherein said pipe moving member is operable for moving pipe to said mast assembly and away from said mast assembly, wherein said pipe moving member is remotely operable from said control van; and transporting at least one pipe tub for storing pipe and positioning said pipe tub adjacent said pipe moving member mounted to said skid. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11)
-
-
12. A method of deploying a mobile rig system to a well site, comprising:
-
transporting a control van to said well site for controlling drilling operations at said well site; transporting a mast assembly to said well site utilizing a rig carrier, wherein said mast assembly is on the rig carrier and is movable between a lowered position with respect to said rig carrier and an upright position with respect to said rig carrier, and wherein said rig carrier comprises motorized pumps and power sources for raising and lowering said mast assembly on said rig carrier and operating a plurality of rig components on said mobile rig system; providing that said mast assembly comprises a top drive which is transported within said mast assembly, and providing that said top drive is movable along a predefined path; positioning said mast assembly adjacent a wellhead at said well site; raising said mast assembly to said upright position, wherein said mast assembly is remotely operable from said control van using said motorized pumps and said power sources; positioning said top drive so that said predefined path and said wellhead are aligned, wherein sensors are utilized to align said top drive moving along said predefined path with said wellhead; transporting a pipe moving member mounted to a skid, wherein said pipe moving member is remotely operable from said control van; and positioning said pipe moving member on an opposite end of said wellhead with respect to said mast assembly. - View Dependent Claims (13, 14, 15, 16, 17, 18, 19, 20)
-
Specification