×

Two-part set-delayed cement compositions

  • US 9,255,031 B2
  • Filed: 10/30/2013
  • Issued: 02/09/2016
  • Est. Priority Date: 03/09/2012
  • Status: Active Grant
First Claim
Patent Images

1. A method of cementing in a subterranean formation comprising:

  • providing a pozzolan slurry comprising a pozzolan and water;

    wherein the water is present in the pozzolan slurry in an amount of about 33% to about 200% by weight of the pozzolan;

    providing a lime slurry comprising hydrated lime and water;

    wherein the lime is present in the lime slurry in an amount of about 10% to about 100% by weight of the amount of pozzolan present in the pozzolan slurry;

    wherein the water is present in the lime slurry in an amount of about 33% to about 200% by weight of the lime;

    allowing the pozzolan slurry and the lime slurry to remain separate for about one day or longer;

    mixing the pozzolan slurry and the lime slurry to form a cement composition on a surface not within a subterranean formation or mixing the pozzolan slurry and the lime slurry to form a cement composition within a subterranean formation;

    placing the cement composition into a subterranean formation; and

    allowing the cement composition to set in the subterranean formation in which the cement composition was placed.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×