×

Battery management system

  • US 9,304,563 B2
  • Filed: 03/29/2013
  • Issued: 04/05/2016
  • Est. Priority Date: 03/29/2013
  • Status: Active Grant
First Claim
Patent Images

1. A method comprising:

  • determining, by a first baseboard management controller of a first processing module, a need for initiating a first learn cycle on a first battery of the first processing module;

    detecting, by the first baseboard management controller, that a second learn cycle is in progress on a second battery of a second processing module, wherein detecting that the second learn cycle is in progress includes detecting, by the first baseboard management controller, an indication that the second learn cycle is in progress, the indication generated by a second baseboard management controller; and

    postponing the first learn cycle, in response to detecting that the second learn cycle is in progress.

View all claims
  • 14 Assignments
Timeline View
Assignment View
    ×
    ×