×

Merging conveyor

  • US 9,315,341 B2
  • Filed: 03/31/2014
  • Issued: 04/19/2016
  • Est. Priority Date: 03/31/2013
  • Status: Active Grant
First Claim
Patent Images

1. A conveyor configured to advance articles m a longitudinal downstream direction, said conveyor comprising:

  • a. a first lane extending in said longitudinal downstream direction, said first lane comprising a first upper conveying surface moving at a first speed;

    b. a second lane extending in said longitudinal downstream direction, said second lane being spaced apart laterally from said first lane, said second lane comprising a second upper conveying surface moving at a second speed;

    c. a third lane extending in said longitudinal downstream direction and interposed between said first and second lanes, said third lane comprising a third upper conveying surface moving at a third speed;

    d. a fourth lane extending in said longitudinal downstream direction and interposed between said second and third lanes, said fourth. lane comprising a fourth upper conveying surface moving at a fourth speed;

    e. said first upper conveying surface configured to impart a force at at least a first angle relative to the longitudinal downstream direction toward said third lane to articles traveling on said first upper conveying surface;

    f. said second upper conveying surface configured to impart a force at a second angle relative to the longitudinal downstream direction toward said fourth lane to articles traveling on said second upper conveying surface;

    g. said third conveying surface configured to impart a force at a third angle relative to the longitudinal downstream direction toward said second lane to articles traveling on said third upper conveying surface; and

    h. said fourth conveying surface configured to impart a force at a fourth angle relative to the longitudinal downstream direction toward said third lane to articles traveling on said fourth upper conveying surface, the fourth angle being greater than the second angle.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×