Electronic apparatus, and charging control method
First Claim
1. An electronic apparatus that selectively uses as a power source one of a battery and an external power source to be powered therefrom, comprising:
- a peak shift information retrieving unit that receives, from a peak shift database server, a peak shift time band during which power demand for an electric power company is lower than the power demand during a time period other than the received peak shift time band, the peak shift database server being configured to store each of a plurality of pieces of position information identifying regions to which a plurality of electric power companies are responsible for supplying power, in association with one of the peak shift time bands;
a charging unit that charges the battery through the external power source;
a power status determining unit that determines whether the external power source is able to drive the electronic apparatus;
a history storage unit that stores a history of determination results of the power status determining unit; and
a charging control unit that sets, to a first level, an upper limit of battery remaining power at which a charging operation of the charging unit is determined as being complete when the history of the determination results indicates that the external power source was previously unable to drive the electronic apparatus for at least part of a specific past period, and sets the upper limit to a second level lower than the first level when the history of the determination results indicates that the external power source was previously able to drive the electronic apparatus throughout the specific past period, wherein the peak shift information retrieving unit receives the peak shift time band that is associated, by the peak shift database server, with the plurality of piece of position information identifying on a region in which the electric apparatus is currently located so that the received peak shift time band varies depending on a location of the electric apparatus; and
the charging control unit permits the charging unit to perform the charging operation during the received peak shift time band, and restricts the charging operation of the charging unit during the time period other than the received peak shift time band.
2 Assignments
0 Petitions
Accused Products
Abstract
An electronic apparatus that selectively uses as a power source one of a battery and an external power source to be powered therefrom, the electronic apparatus includes: a charging unit that charges the battery through the external power source; a power status determining unit that determines whether the external power source can drive the electronic apparatus; a history storage unit that stores a history of determination results of the power status determining unit; and a charging control unit that sets, to a maximum capacity of the battery, an upper limit of battery remaining power if the history indicates that the external power source can not drive for at least part of a specific past period, or sets the upper limit to a given value lower than the maximum capacity if the history indicates that the external power source can drive throughout the specific past period.
10 Citations
6 Claims
-
1. An electronic apparatus that selectively uses as a power source one of a battery and an external power source to be powered therefrom, comprising:
- a peak shift information retrieving unit that receives, from a peak shift database server, a peak shift time band during which power demand for an electric power company is lower than the power demand during a time period other than the received peak shift time band, the peak shift database server being configured to store each of a plurality of pieces of position information identifying regions to which a plurality of electric power companies are responsible for supplying power, in association with one of the peak shift time bands;
a charging unit that charges the battery through the external power source;
a power status determining unit that determines whether the external power source is able to drive the electronic apparatus;
a history storage unit that stores a history of determination results of the power status determining unit; and
a charging control unit that sets, to a first level, an upper limit of battery remaining power at which a charging operation of the charging unit is determined as being complete when the history of the determination results indicates that the external power source was previously unable to drive the electronic apparatus for at least part of a specific past period, and sets the upper limit to a second level lower than the first level when the history of the determination results indicates that the external power source was previously able to drive the electronic apparatus throughout the specific past period, wherein the peak shift information retrieving unit receives the peak shift time band that is associated, by the peak shift database server, with the plurality of piece of position information identifying on a region in which the electric apparatus is currently located so that the received peak shift time band varies depending on a location of the electric apparatus; and
the charging control unit permits the charging unit to perform the charging operation during the received peak shift time band, and restricts the charging operation of the charging unit during the time period other than the received peak shift time band. - View Dependent Claims (2, 3)
- a peak shift information retrieving unit that receives, from a peak shift database server, a peak shift time band during which power demand for an electric power company is lower than the power demand during a time period other than the received peak shift time band, the peak shift database server being configured to store each of a plurality of pieces of position information identifying regions to which a plurality of electric power companies are responsible for supplying power, in association with one of the peak shift time bands;
-
4. A charging control method of an electronic apparatus that selectively uses as a power source one of a battery and an external power source to be powered therefrom and includes a charging unit that charges the battery through the external power source, the charging control method comprising:
-
receiving, from a peak shift database server, peak shift time band during which power demand for an electric power company is lower than the power demand during a time period other than the received peak shift time band, the peak shift database server being configured to store each of plural pieces of position information on a region to which the electric power company responsible for supplying power, in association with one of peak shift time bands; determining whether the external power source is able to drive the electronic apparatus, and storing a history of determination results; and setting, to a first level, an upper limit of battery remaining power at which a charging operation of the electric apparatus is determined as being complete when the history of the determination results indicates that the external power source was previously unable to drive the electronic apparatus for at least part of a specific past period, and setting the upper limit to a second level lower than the first level when the history of the determination results indicates that the external power source was previously able to drive the electronic apparatus throughout the specific past period, wherein the electric apparatus receives the peak shift time band that is associated, by the peak shift database server, with a piece of position information identifying a region in which the electric apparatus is currently located so that the received peak shift time band varies depending on a location of the electric apparatus; and the charging operation is permitted during the received peak shift time band, and the charging operation is restricted during the time period other than the received peak shift time band. - View Dependent Claims (5, 6)
-
Specification