×

Meter register transmitting flow rate warning

  • US 9,356,334 B2
  • Filed: 01/20/2012
  • Issued: 05/31/2016
  • Est. Priority Date: 03/09/2001
  • Status: Expired due to Term
First Claim
Patent Images

1. A method of detecting a leak in a liquid consumption system, comprising the following steps:

  • providing a meter housing having a liquid inlet opening, a liquid outlet opening, a measuring chamber between, and in fluid communication with, the liquid inlet and the liquid outlet openings, and a cavity having an access opening;

    providing a meter register in the access opening of the meter housing, wherein the meter register comprises a microprocessor and the meter register is coupled with the measuring chamber to coact with the measuring chamber to receive liquid flow information from the measuring chamber, wherein the microprocessor of the meter register receives the liquid flow information and measures the amount of liquid flowing through the measuring chamber as a function of time defined as a measured flow rate;

    passing a liquid from a liquid source, through the liquid inlet opening of the meter, through the measuring chamber of the meter and through the liquid outlet opening of the meter to the liquid consumption system, wherein as the liquid moves through the measuring chamber, the measuring chamber generates the liquid flow information, and the microprocessor provides the measured flow rate;

    generating a signal indicating a leak when the measured flow ate is greater than zero and when at least one of the following events occurs;

    (i) the measured flow rate remains constant over a fixed period of time, or(ii) the measured flow rate exceeds a threshold flow rate value; and

    providing a transmitting element and a plurality of sensors coacting with a rotatable member, whereby when said rotatable member rotates about an axis, the transmitting element activates said sensors that send signals to said microprocessor to correspond said signals with a flow rate and/or flow volume measured by said meter register.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×