×

Workload routing for managing energy in a data center

  • US 9,361,161 B2
  • Filed: 06/09/2014
  • Issued: 06/07/2016
  • Est. Priority Date: 06/21/2009
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method for managing energy in a data center comprising:

  • determining, via at least one computing device, a current energy profile of each of a plurality of systems within the data center, the current energy profile comprising an overall rating expressed as an integer value on a relative scale, the overall rating calculated based on a current workload usage, a time of day, and environmental conditions surrounding each of the plurality of systems; and

    prioritizing, via the at least one computing device, a routing of a workload to a set of systems from the plurality of systems within the data center having the least amount of energy present based on a comparison of the overall ratings, on the relative scale, for each of the plurality of systems within the data center;

    wherein the prioritizing the routing comprises routing the workload to an intermediate system that is within the set of systems within the data center.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×