Method and arrangement for controlling an operation of an electric energy production facility during a disconnection to a utility grid

  • US 9,366,233 B2
  • Filed: 03/01/2012
  • Issued: 06/14/2016
  • Est. Priority Date: 03/21/2011
  • Status: Active Grant
First Claim
Patent Images

1. A method for operating an electric energy production facility comprising at least one wind turbine during a fault in a utility grid to which energy is to be delivered, the method comprising:

  • disconnecting the utility grid from the wind turbine,connecting an external generator via a cable to an auxiliary equipment of the wind turbine, to deliver active power to the auxiliary equipment,wherein the cable is connected via a transformer to a converter of the wind turbine,wherein the converter supports reactive power,arranging at least two conductors of the cable to introduce a distributed capacitance to the cable,applying a voltage between said at least two conductors of the cable by the external generator to supply energy to the auxiliary equipment, the applying of the voltage between said at least two conductors of the cable at least in part effective to generate reactive power based on the introduced distributed capacitance to the cable;

    when the generated reactive power is larger than an amount of reactive power to be consumed by the auxiliary equipment, absorbing, by the converter connected to the cable, at least a portion of the generated reactive power, effectively reducing an amount of reactive power absorbed by the external generator; and

    applying to one or more power transistors of the converter switching signals configured to permit the converter the absorbing of said at least portion of the generated reactive power.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×