Generator management system that determines a time to activate and deactivate generators based on the load level

  • US 9,368,972 B2
  • Filed: 07/27/2012
  • Issued: 06/14/2016
  • Est. Priority Date: 07/27/2012
  • Status: Active Grant
First Claim
Patent Images

1. A generator management system comprising:

  • a first generator;

    a second generator;

    a bus that connects the first generator and the second generator to a load; and

    a control that determines a time delay to connect the first generator and second generator to the bus and disconnect the first generator and second generator from the bus, wherein the control continuously monitors the instantaneous load supplied by the first generator and the second generator and varies the time delay based on the monitored instantaneous load supplied, wherein the control determines the time delay to connect the first generator and second generator to the bus and disconnect the first generator and second generator from the bus based on a relationship between the load supplied by any of the connected first generator and second generator and a set point stored in the control.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×