×

Maximizing hydrocarbon production while controlling phase behavior or precipitation of reservoir impairing liquids or solids

  • US 9,388,686 B2
  • Filed: 01/11/2011
  • Issued: 07/12/2016
  • Est. Priority Date: 01/13/2010
  • Status: Active Grant
First Claim
Patent Images

1. A method of producing fluid from a formation, the method comprising:

  • detecting impending condensing conditions for a reservoir impairing substance which is present in the fluid, wherein a first densitometer is positioned upstream of a flow restriction, and a second densitometer is positioned downstream of the flow restriction, whereby the impending condensing conditions are indicated by a change in density of the fluid as the fluid flows through the flow restriction; and

    automatically adjusting a flow control device in response to the detecting, thereby preventing the reservoir impairing substance from condensing in flow passages within the formation and in a wellbore intersecting the formation during production of the fluid.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×