System and method for predicting transient cooling performance for data center
First Claim
Patent Images
1. A computer-implemented method for evaluating transient cooling performance of a data center, the method comprising:
- receiving input data from a storage device, the input data including data center architecture information and operating data;
performing transient cooling performance calculations for the data center using the input data, the transient cooling performance calculations including calculating at least one predicted temperature in the data center during a power outage of the data center; and
displaying results of the transient cooling performance calculations in a data center management system, wherein the results include at least one of a cooling runtime and a maximum predicted temperature of the data center following the power outage of the data center.
2 Assignments
0 Petitions
Accused Products
Abstract
A system and method is provided for evaluating the transient cooling performance of a data center. In one version, the method includes receiving input data from a storage device, the input data including data center architecture information and operating data, performing transient cooling performance calculations for the data center using the input data, and displaying results of the transient cooling performance calculations, wherein the results include at least one of a cooling runtime and a maximum predicted temperature of the data center following a power outage of the data center.
-
Citations
20 Claims
-
1. A computer-implemented method for evaluating transient cooling performance of a data center, the method comprising:
-
receiving input data from a storage device, the input data including data center architecture information and operating data; performing transient cooling performance calculations for the data center using the input data, the transient cooling performance calculations including calculating at least one predicted temperature in the data center during a power outage of the data center; and displaying results of the transient cooling performance calculations in a data center management system, wherein the results include at least one of a cooling runtime and a maximum predicted temperature of the data center following the power outage of the data center. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8)
-
-
9. A system for evaluating transient cooling performance of a data center, the system comprising:
-
a storage device; a display; a controller coupled to the storage device and the display and configured to; receive input data from the storage device, the input data including data center architecture information and operating data; perform transient cooling performance calculations for the data center using the input data, the transient cooling performance calculations including calculating at least one predicted temperature in the data center during a power outage of the data center; and control the display to display results of the transient cooling performance calculations in a data center management system, wherein the results include at least one of a cooling runtime and a maximum predicted temperature of the data center following the power outage of the data center. - View Dependent Claims (10, 11, 12, 13, 14, 15)
-
-
16. A non-transitory computer readable medium having stored thereon sequences of instruction including instructions that will cause a processor to:
-
receive input data regarding a layout of a data center and cooling systems contained in the data center; store the input data; perform transient cooling performance calculations for the data center using the input data, the transient cooling performance calculations including calculating at least one predicted temperature in the data center during a power outage of the data center; and control a display to display results of the transient cooling performance calculations in a data center management system, wherein the results include at least one of a cooling runtime and a maximum predicted temperature of the data center following the power outage of the data center. - View Dependent Claims (17, 18, 19, 20)
-