1. A computer-implemented method for evaluating transient cooling performance of a data center, the method comprising:

  • receiving input data from a storage device, the input data including data center architecture information and operating data;

    performing transient cooling performance calculations for the data center using the input data, the transient cooling performance calculations including calculating at least one predicted temperature in the data center during a power outage of the data center; and

    displaying results of the transient cooling performance calculations in a data center management system, wherein the results include at least one of a cooling runtime and a maximum predicted temperature of the data center following the power outage of the data center.