Controlling power generators and chillers
First Claim
1. A method of meeting a power demand of a power consumption unit, comprising:
- providing a chiller for regulating a temperature of the power consumption unit, a heat storage unit for supplying heat to the chiller, and an electric power system of the power consumption unit for providing electrical power to the power consumption unit and to the chiller;
determining, by a processing device, a forecasted power demand for a power demand scenario for the power consumption unit;
determining a probability of occurrence of the power demand scenario;
creating an objective function for operating a power supply device to supply power to the electric power system, wherein the objective function includes the forecasted power demand of the power demand scenario and the determined probability of occurrence of the power demand scenario;
locating a substantial minimum of the objective function to determine a schedule for operating the power supply device to meet the forecasted power demand, wherein a relation between a fuel consumption of the power supply device and a power output of the power supply device is represented using a piece-wise linear function; and
operating the power supply device according to the determined schedule to meet the power demand of the power consumption unit.
1 Assignment
0 Petitions
Accused Products
Abstract
A method of meeting a power demand of a power consumption unit is disclosed. A forecasted power demand for a power demand scenario for the power consumption unit is determined and a probability of occurrence of the power demand scenario is determined. An objective function for operating at least one power supply device is created that includes the forecasted power demand of the power demand scenario and the determined probability of occurrence of the power demand scenario. A substantial minimum of the objective function is located to determine a schedule for operating the at least one power supply device to meet the forecasted power demand. The at least one power supply device may be operated according to the determined schedule to meet the power demand of the power consumption unit.
-
Citations
18 Claims
-
1. A method of meeting a power demand of a power consumption unit, comprising:
-
providing a chiller for regulating a temperature of the power consumption unit, a heat storage unit for supplying heat to the chiller, and an electric power system of the power consumption unit for providing electrical power to the power consumption unit and to the chiller; determining, by a processing device, a forecasted power demand for a power demand scenario for the power consumption unit; determining a probability of occurrence of the power demand scenario; creating an objective function for operating a power supply device to supply power to the electric power system, wherein the objective function includes the forecasted power demand of the power demand scenario and the determined probability of occurrence of the power demand scenario; locating a substantial minimum of the objective function to determine a schedule for operating the power supply device to meet the forecasted power demand, wherein a relation between a fuel consumption of the power supply device and a power output of the power supply device is represented using a piece-wise linear function; and operating the power supply device according to the determined schedule to meet the power demand of the power consumption unit. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9)
-
-
10. A method of determining a power demand of a power consumption unit, comprising:
-
determining, by a processing device, a forecasted power demand for a selected power demand scenario for the power consumption unit; determining a probability of occurrence of the selected power demand scenario; creating an objective function for operating at least one power production device to meet the forecasted power demand and the determined probability of occurrence of the power demand scenario, wherein the at least one power production device supplies power to an electric power system of the power consumption unit and the electric power system provides electrical power to the power consumption unit and to a chiller for regulating a temperature of the power consumption unit, the chiller receiving heat from a heat storage unit; and finding a substantial minimum of the objective function to determine a schedule for operating the at least one power production device to determine the power demand of the power consumption unit, wherein a relation between a fuel consumption of the power production device and a power output of the power production device is represented using a piece-wise linear function. - View Dependent Claims (11, 12, 13, 14, 15, 16, 17, 18)
-
Specification