×

Smart building manager

  • US 9,429,927 B2
  • Filed: 11/26/2013
  • Issued: 08/30/2016
  • Est. Priority Date: 06/22/2009
  • Status: Active Grant
First Claim
Patent Images

1. A building manager comprising:

  • a communications interface configured to receive time-of-use pricing information from a smart energy grid; and

    a processing circuit comprising a processor and non-transitory computer-readable medium with instructions executable by the processor stored thereon, the non-transitory computer-readable medium comprising;

    an integrated control layer configured to receive inputs from a plurality of building subsystems and to provide outputs to the plurality of building subsystems, the integrated control layer including a plurality of control algorithm modules configured to process the inputs and to determine the outputs; and

    a demand response layer configured to process the time-of-use pricing information received from the smart energy grid to determine adjusted setpoints for the plurality of control algorithm modules of the integrated control layer, the adjusted setpoints comprising setpoint energy transfer rates into thermal energy storage tanks and out of thermal energy storage tanks;

    wherein the integrated control layer is configured to use the setpoint energy transfer rates to generate control signals for the plurality of building subsystems and provide the control signals as the outputs to the plurality of building subsystems.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×