×

Height adjustment bracket for roof applications

  • US 9,431,953 B2
  • Filed: 10/30/2015
  • Issued: 08/30/2016
  • Est. Priority Date: 10/31/2014
  • Status: Active Grant
First Claim
Patent Images

1. A roof mount, comprising:

  • a base installable on a roof surface and capable of being coupled to the roof surface, the base defining a slot extending in a first direction, wherein the first direction extends substantially parallel to the roof surface in response to the base being installed on and coupled to the roof surface;

    a first fastener having a head positioned in the slot and moveable along the slot in the first direction, and a shaft extending in a second direction, wherein the second direction extends substantially perpendicular to the roof surface in response to the base being installed on and coupled to the roof surface and the first fastener being installed in the base;

    a clamp connected to the base by the first fastener, a distance between the clamp and the base is adjustable in the second direction, the clamp including,a first recess sized to receive and support a first solar panel, the first recess defined between a first top flange and a first bottom flange, the first recess having a first height extending between the first top flange and the first bottom flange, the first height being adjustable, anda second recess sized to receive and support one of a second solar panel and a skirt flange, the second recess defined between a second top flange and a second bottom flange, the second recess having a second height extending between the second top flange and the second bottom flange, the second height being adjustable, anda second fastener connected to the clamp, the second fastener operable to adjust the first height and the second height,wherein in response to tightening of the second fastener, the first height increases and the second height decreases, andwherein in response to loosening of the second fastener, the first height decreases and the second height increases.

View all claims
  • 5 Assignments
Timeline View
Assignment View
    ×
    ×