Conditioning an electric grid using electric vehicles
First Claim
Patent Images
1. A system, comprising:
- a grid communication component, wherein the grid communication component is configured to receive information from an electric grid associated with an expected load condition of the electric grid; and
a vehicle control component in communication with computing systems of multiple electric vehicles connected to the electric grid, wherein the vehicle control component is configured to selectively control charging operations of the multiple electric vehicles connected to the electric grid based on the information associated with the expected load condition of the electric grid, by;
transmitting control instructions to a computing system of at least one electric vehicle to start an active charging of the at least one electric vehicle when the expected load condition of the electric grid indicates electric production is greater than electric consumption, ortransmitting control instructions to the computing system of at least one electric vehicle to stop an active charging of the at least one electric vehicle when the expected load condition of the electric grid indicates electric consumption is greater than electric production.
1 Assignment
0 Petitions
Accused Products
Abstract
A grid to vehicle system is described. In some examples, the system selectively controls one or more electric vehicles connected to an electric grid based on conditions associated with the electric grid. For example, the system may control charging operations of the electric vehicles based on load balancing conditions associated with the electric grid, based on cost conditions associated with electric power provided by the electric grid, and so on.
8 Citations
9 Claims
-
1. A system, comprising:
-
a grid communication component, wherein the grid communication component is configured to receive information from an electric grid associated with an expected load condition of the electric grid; and a vehicle control component in communication with computing systems of multiple electric vehicles connected to the electric grid, wherein the vehicle control component is configured to selectively control charging operations of the multiple electric vehicles connected to the electric grid based on the information associated with the expected load condition of the electric grid, by; transmitting control instructions to a computing system of at least one electric vehicle to start an active charging of the at least one electric vehicle when the expected load condition of the electric grid indicates electric production is greater than electric consumption, or transmitting control instructions to the computing system of at least one electric vehicle to stop an active charging of the at least one electric vehicle when the expected load condition of the electric grid indicates electric consumption is greater than electric production. - View Dependent Claims (2, 3)
-
-
4. A method, comprising:
-
receiving information from an electric grid associated with an expected load condition of the electric grid; and selectively controlling charging operations of multiple electric vehicles connected to the electric grid based on the received information associated with the expected load condition of the electric grid, by; transmitting control instructions to a computing system of at least one electric vehicle to start an active charging of the at least one electric vehicle when the expected load condition of the electric grid indicates electric production is greater than electric consumption, or transmitting control instructions to the computing system of at least one electric vehicle to stop an active charging of the at least one electric vehicle when the expected load condition of the electric grid indicates electric consumption is greater than electric production. - View Dependent Claims (5, 6)
-
-
7. A non-transitory computer-readable medium whose contents, when executed by a computing system, cause the computing system to perform a method, comprising:
-
receiving information from an electric grid associated with an expected load condition of the electric grid; and selectively controlling charging operations of multiple electric vehicles connected to the electric grid based on the received information associated with the expected load condition of the electric grid, by; transmitting control instructions to a computing system of at least one electric vehicle to start an active charging of the at least one electric vehicle when the expected load condition of the electric grid indicates electric production is greater than electric consumption, or transmitting control instructions to the computing system of at least one electric vehicle to stop an active charging of the at least one electric vehicle when the expected load condition of the electric grid indicates electric consumption is greater than electric production. - View Dependent Claims (8, 9)
-
Specification