×

Performing-time-series based predictions with projection thresholds using secondary time-series-based information stream

  • US 9,454,902 B2
  • Filed: 09/17/2013
  • Issued: 09/27/2016
  • Est. Priority Date: 04/16/2013
  • Status: Active Grant
First Claim
Patent Images

1. A computer program product comprising:

  • a non-transitory storage media, said non-transitory storage media tangibly embodying a program of instructions executable by the computer for performing a method for managing traffic flow on a road network, the method comprising;

    receiving, at the computer, a first time-series data set having one or more values for each time point to be predicted, the first time-series data set comprising traffic occupancy levels obtained from a sensor device associated with a road of said road network;

    receiving, at the computer, a second time-series data set of one or more values per time point with correlation to the first time-series data, the second time-series data set comprising traffic volume levels at the road;

    estimating, by the computer, a functional relationship between the first time-series data and the second time-series data, for each value, over a multiplicity of time points;

    determining, at the computer, an extremal or other specified value of the functional relationship of the second time-series data as a function of the first time-series data, said extremal or other specified value representing an occupancy level at which a full congested traffic state is reached at the associated sensor device;

    modifying, at the computer, said first time-series data by projecting the occupancy level of the first time series data obtained from the associated sensor device on the extremal or other specified value so that first time-series data values that are beyond the extremal or other specified value are set to the extremal or other specified value, andusing said modified first time-series data in any prediction model to increase accuracy of a future predicted traffic occupancy state; and

    regulating a traffic flow of said road network based on said future predicted traffic occupancy state.

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×