Use of underground gas storage to provide a flow assurance buffer between interlinked processing units

  • US 9,458,700 B2
  • Filed: 04/02/2010
  • Issued: 10/04/2016
  • Est. Priority Date: 04/06/2009
  • Status: Active Grant
First Claim
Patent Images

1. A system for the development of one or more offshore hydrocarbon fields comprising:

  • at least one floating hydrocarbon processing unit (1) that is moored to a seabed (21) and connected to a hydrocarbon reservoir (40) via a riser (2) and a wellhead (3) on the seabed, the floating hydrocarbon processing unit (1) receiving and processing a hydrocarbon mixture received from the hydrocarbon reservoir (40) via the riser (2), the floating hydrocarbon processing unit (1) being provided with process equipment adapted to separate all of the received hydrocarbon mixture into an oil fraction, a water fraction, and a gas fraction and provided with rectangular storage tanks (12) adapted for storage of the separated oil fraction of the mixture at or near ambient pressure,a gas storage buffer reservoir (7) placed at a certain distance from and isolated from the hydrocarbon reservoir (40)a gas export riser (5) connected to the floating hydrocarbon processing unit (1) and the gas storage buffer reservoir (7) to export the separated gas fraction of the mixture from the floating hydrocarbon processing unit (1) and inject the separated gas fraction of the mixture into the gas storage buffer reservoir (7) for temporary storage of the separated gas fraction of the mixture,a gas riser (8) connected with one end to the gas storage buffer reservoir (7) and with another end connected to a floating gas processing unit (9) for processing the separated gas received from the gas storage buffer reservoir (7) so that the processed separated gas can be transported to shore,wherein the gas buffer reservoir, serving as temporary storage of the produced gas in case of production interruption on either the floating hydrocarbon processing unit (1) or the floating gas processing unit (9), controls the gas flow between the floating hydrocarbon processing unit (1) and the floating gas processing unit (9) working in conjunction, with no interdependence between the activities of the hydrocarbon processing unit (1) and the gas processing unit (9),wherein the floating gas processing unit (9) comprises a gas liquefaction plant (13) that processes and stores produced liquefied gas,at least one oil shuttle tanker (16) adapted to transport the separated oil from the floating hydrocarbon processing unit (1) in rectangular tanks at or near ambient pressure, andat least one LNG shuttle tanker (15) that transports the produced liquefied gas, from the floating gas processing unit (9).

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×