×

System and method for generating shipment forecasts for materials handling facilities

  • US 9,466,043 B1
  • Filed: 03/15/2013
  • Issued: 10/11/2016
  • Est. Priority Date: 09/24/2010
  • Status: Active Grant
First Claim
Patent Images

1. A system, comprising:

  • one or more processors;

    a memory, storing program instructions that when executed by the one or more processors implement a forecasting component and a control system;

    wherein the forecasting component is configured to;

    for a particular time period;

    generate a projection of a quantity of shipments that will be shipped from a materials handling facility for each shipment service level of multiple different shipment service levels during the particular time period, wherein the projected quantity of shipments for a respective service level is the quantity of shipments shipped according to that shipment service level;

    based on one or more shipment characteristics, separate the projected quantities of shipments into at least two shipment volume portions;

    for each shipment volume portion, receive information specifying a distribution of different shipment methods that are projected to be utilized to ship shipments of the shipment volume portion during the particular time period;

    based on the distribution received for each shipment volume portion and the projected quantity of shipments within each volume portion, generate a forecast for a combined shipment volume, wherein said forecast specifies respective quantities of shipments for the combined shipment volume that are to be shipped during the particular time period according to each of the different shipment methods; and

    instruct one or more staffing level assignments for one or more work stations in the materials handling facility according to the forecast for the combined shipment volume; and

    wherein the control system is configured to;

    route, via conveyance mechanisms, shipments of items picked from inventory maintained in the materials handling facility to the one or more work stations for preparation for shipment by agents assigned to the one or more work stations based on the forecast for the combined shipment volume according to one or more of the different shipment methods.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×