×

Cast-in-place fiber technology

  • US 9,466,966 B2
  • Filed: 06/22/2015
  • Issued: 10/11/2016
  • Est. Priority Date: 03/15/2013
  • Status: Active Grant
First Claim
Patent Images

1. A method, comprising:

  • creating a channel in a roadway, wherein a depth of the channel is less than a depth of the roadway and the channel does not compromise a structural integrity of the roadway;

    placing one or more cables in the channel; and

    filling at least a portion of the channel with one or more capping materials, wherein at least one of the one or more capping materials encapsulates the one or more cables, and wherein the one or more capping materials comprise a plurality of layers of different capping materials, at least one of which comprises polyurea.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×